Plan Review Notes
Plan Review Notes For Project Z20060013
Project Number Z20060013
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-07-09 10:08:47THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. NO ENGINEERING PLANS PROVIDED.
  
 2. REPLACE THE DAMAGED SIDEWALK ADJACENT TO THE
 PROPERTY.
  
 3. CONSTRUCT 6-INCH THICK CONCRETE SIDEWALK AT THE
 PROPOSED DRIVEWAY LOCATION.
  
 4. SHOW UTILITIES ON THE PLANTING PLAN.
  
 5. CONSIDER REDUCING THE PARKING STALL DEPTHS BY
 INCORPORATING A 2' LANDSCAPED OVERHANG.
  
 6. A LWDD PERMIT MAY BE REQUIRED.
  
 7. THE ENTRY GATES, WHEN OPEN, WILL BLOCK THE PUBLIC
 SIDEWALK.
  
 8. 90-DEGREE PARKING GENERALLY REQUIRES 24' DRIVE
 AISLE.
  
 9. CONFIRM THERE WILL BE SUFFICIENT WIDTH BETWEEN THE
 EASTERN PARKING SPACES AND EDGE OF PAVEMENT TO MANEUVER
 A CAR ADJACENT TO THE LAKE'S TOP OF BANK. A TURN AROUND
 SPACE MAY BE REQUIRED IF THE DRIVE AISLE IS A DEAD-END.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND
 DRAINAGE CALCULATIONS PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  