| Plan Review Notes For Project Z20050014 |
| Project Number |
Z20050014 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-06-11 14:06:11 | TRAFFIC STATEMENT COMMENTS: | | | 1. PLEASE CLARIFY HOW MANY VEHICULAR TRIPS ARE | | | GENERATED FROM THE EXISTING STADIUM DURING EACH EVENT | | | AND HOW MANY VEHICULAR TRIPS ARE EXPECTED WITH THE | | | PROPOSED EXPANSION. | | | 2. PROVIDE AN HCM INTERSECTION ANALYSIS AT THE MILITARY | | | TRAIL AND NORTHWOOD UNIVERSITY DR INTERSECTION BASED ON | | | SUCH VOLUMES | | | 3. CLARIFY WHAT EVENT MANAGEMENT STRATEGIES ARE | | | DEPLOYED TODAY DURING EACH GAME AND WHAT STRATEGIES | | | WILL BE USED WITH THE EXPANSION FOR MITIGATION PURPOSES | | | 4. VERIFY IF LEFT-TURN EGRESS AT THE MAIN DRIVEWAY ON | | | MILITARY TRAIL POST-GAME WOULD CAUSE DELAY AT THE | | | DRIVEWAY, AND IF ANY TRAFFIC CONTROL MEASURES WOULD BE | | | DEPLOYED AT THE DRIVEWAYS TO DIRECT TRAFFIC PRE-GAME | | | AND POST-GAME. | | | | | | SITE PLAN COMMENTS: | | | 1. PLEASE PROVIDE THE PARKING STUDY INDICATED IN THE | | | MASTER PLAN WHICH INDICATES A 30% REDUCTION OF PARKING | | | SPACES | | | | | | CONDITION: | | | 1. TBD | | | |
| |
Print |
|