Plan Review Notes
Plan Review Notes For Project Z20050014
Project Number Z20050014
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-06-11 10:05:58THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. INDICATE IF ADDITIONAL WATER QUALITY TREATMENT WILL
 BE NEEDED FOR THE RUNOFF FROM THE CONCRETE PADS
 CONSTRUCTED FOR THE TWO ADDITIONAL SETS OF BLEACHERS.
  
 2. PREPARE AND SUBMIT A STORMWATER MASTER PLAN FOR THE
 ENTIRE CAMPUS. THE STORMWATER MASTER PLAN SHOULD
 INCLUDE THE PROPOSED AND EXISTING DEVELOPMENT OF THE
 CAMPUS AND INDICATE HOW MUCH ADDITIONAL STORMWATER
 MANAGEMENT AREAS (LAKES, DRY DETENTION AREAS, ETC) WILL
 BE NEEDED FOR EACH AREA TO BE DEVELOPED.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND
 DRAINAGE CALCULATIONS PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved