Plan Review Notes
Plan Review Notes For Project Z20050013
Project Number Z20050013
Review Stop STORM
Sequence Number 4
Notes
Date Text
2021-05-08 23:20:22THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. CONSTRUCTION EASEMENT AND APPROVAL OF SWALE MAY BE
 NEEDED FOR SWALE CONSTRUCTION WEST OF THE WEST PROPERTY
 LINE AS DEPICTED ON TYPICAL SECTION B-B.
  
 2. WHERE DOES THE SWALE DEPICTED IN SECTION B-B DRAIN
 TO?
  
 3. WILL SOUTH DRIVEWAY PREVENT POSITIVE DRAINAGE OF THE
 SWALE NORTH OF THE DRIVEWAY FROM REACHING THE EXISTING
 STORM INLET?
  
 4. THE WEST MITERED END SECTION OF THE PROPOSED NORTH
 DRIVEWAY CULVERT APPEARS TO BE IN CONFLICT WITH THE
 CART/PEDESTRIAN SIDEWALK. THE MES? ARE DRAWN BACKWARDS.
  
 5. PROVIDE CROSS SECTIONS OF EACH DRIVEWAY FROM EDGE OF
 ROAD PAVEMENT TO 5 FEET BEYOND THE HIGHPOINT OF THE
 DRIVEWAY OUTSIDE THE RIGHT OF WAY.
  
 6. WILL THE CONCRETE SIDEWALKS CONTINUE THROUGH THE
 DRIVEWAYS?
  
 7. OBTAIN APPROVAL FROM ENTITY RESPONSIBLE FOR THE ROAD
 RIGHT OF WAY AND DRAINAGE SYSTEM TO INSTALL DRAINAGE
 STRUCTURES IN THE RIGHT OF WAY AND CONNECT TO THE ROAD
 DRAINAGE SYSTEM.
  
 8. IDENTIFY WHO WILL BE RESPONSIBLE TO MAINTAIN THE
 PROPOSED DRAINAGE STRUCTURE AND PIPES IN THE ROAD RIGHT
 OF WAY. THIS INCLUDES THE PROPOSED DRIVEWAY CULVERT AND
 THE PIPE CONNECTION TO THE EXISTING STORM INLET.
  
 9. INDICATE IF A PERIMETER BERM WILL BE REQUIRED TO
 CONTAIN STORMWATER RUNOFF UP TO THE 25-YEAR 3-DAY STORM
 EVENT.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION WITH
 THE ENGINEERING PERMIT APPLICATION.
  
 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved