| 2021-04-08 10:27:32 | A NEW SITE PLAN IS BEING PRESENTED FOR THIS |
| | DEVELOPMENT. THIS IS A CONCEPTUAL LEVEL REVIEW. |
| | CONSTRUCTION LEVEL DETAILS, DESIGN CALCULATIONS AND THE |
| | POLLUTION PREVENTION PLAN WILL BE REVIEWED AS PART OF |
| | THE ENGINEERING DEVELOPMENT APPROVAL AND BUILDING |
| | PERMIT APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. LIMITED DESIGN INFORMATION IS PROVIDED ON THE |
| | CONCEPTUAL ENGINEERING PLANS. |
| | |
| | 2. CAN THE PROPOSED 2? HIGH RETAINING WALL AT THE SW |
| | CORNER OF THE SITE BE LOCATED OUTSIDE THE 20? DRAINAGE |
| | EASEMENT? |
| | |
| | 3. UPDATE THE UTILITIES SHOWN ON THE LANDSCAPE PLANS. |
| | |
| | 4. ON THE ENGINEERING PLANS USE THE NAVD-NGVD |
| | CONVERSION FACTOR PROVIDED ON THE SURVEY. |
| | |
| | 5. PROVIDE A SWALE BETWEEN THE EAST PROPERTY LINE AND |
| | THE BACK OF CURB TO PREVENT DIRECT STORMWATER RUNOFF |
| | FROM THE PROPERTY. ALSO SHOW A SWALE BETWEEN THE FRONT |
| | OF SIDEWALK AND EDGE OF PAVEMENT OF PRESIDENTIAL WAY. |
| | SHOW THE SWALES ON TYPICAL SECTION A-A. |
| | |
| | 6. WHY IS THE SIDEWALK ALONG PRESIDENTIAL WAY BEING |
| | RELOCATED? |
| | |
| | 7. PRESIDENTIAL WAY IS A PRIVATE ROAD, OWNED BY |
| | PRESIDENTIAL WAY ASSN INC. ACCORDING TO THE COUNTY |
| | PROPERTY APPRAISER?S WEBSITE. PERMISSION MAY BE NEEDED |
| | FROM THE OWNER FOR WORK WITHIN THE ROADWAY PARCEL. |
| | |
| | 8. THE OVERALL MASTER DRAINAGE SYSTEM IS MAINTAINED BY |
| | BANYAN CAY DEVELOPMENT LLC ACCORDING TO SFWMD PERMIT |
| | 50-07830-P (APPL. 161104-19). PROVIDE A LETTER FROM THE |
| | ENTITY INDICATING ITS ACCEPTANCE OF THE STORMWATER |
| | RUNOFF FROM THIS PROJECT INTO THE MASTER DRAINAGE |
| | SYSTEM. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION WITH |
| | THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE |
| | ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |