Plan Review Notes
Plan Review Notes For Project Z20050013
Project Number Z20050013
Review Stop ENG - PPRC
Sequence Number 2
Notes
Date Text
2020-08-27 10:49:06COMMENTS PER RICK ROSSANO, PROJECT COORD., WPB ENG.
 SERVICES, [email protected] (561) 494-1098:
  
 PLEASE PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
  
 FOLLOWING COMMENTS FROM MARK HURLEY, FIELD CUSTOMER
 SERVICE SUPERVISOR, CITY OF WEST PALM BEACH PUBLIC
 UTILITIES, 561-822-2262 [email protected]
  
 -ON CONCEPTUAL WATER PLAN & DEMO PLAN THERE ARE TWO
 AREAS ON PRESIDENTIAL WAY THAT SAY ?SAWCUT REMOVE &
 REPLACE?. DOES NOT APPEAR TO BE WORK THERE ANYMORE ?
 MAY BE ABLE TO ELIMINATE OR RELOCATE THOSE.
  
 -PAVEMENT RESTORATION MAY BE REQUIRED FOR NEW WATER
 SERVICE.
  
 -PLEASE SHOW AND LABEL ON PLANS ANY EXISTING WATER
 SERVICES AND METERS THAT WILL BE CUT BACK TO MAIN
 PURSUANT TO PRIOR COMMENTS. I BELIEVE THERE IS AT LEAST
 ONE METERED WATER SERVICE THAT WOULD BE APPLICABLE.
 THAT WORK MAY REQUIRE PAVEMENT RESTORATION.
  
 -PLEASE PROVIDE RESPONSE WITH FINDINGS ON EXISTENCE OF
 UTILITY EASEMENTS FOR WATER MAINS RUNNING ALONG
 PRESIDENTIAL WAY AND PROPOSED WATER SERVICE LINE. PRIOR
 RESPONSE SAID APPLICANT IS IN PROCESS OF DETERMINING.
  
 -WILL A DEDICATED, METERED, IRRIGATION WATER SERVICE BE
 NEEDED FOR THE PROPERTY? IF SO, PLEASE ADD TO WATER
 PLAN.
  
 -WHEN DESIGNING ENLARGED VIEW PLAN OF WATER METER AND
 BACKFLOW PREVENTER LAYOUT, UTILITIES RECOMMENDS
 DUAL/PARALLEL BACKFLOW ASSEMBLIES ON THE DOMESTIC WATER
 SERVICE TO REDUCE DOWNTIME DURING BACKFLOW MAINTENANCE.
  
  