Plan Review Notes
Plan Review Notes For Project Z20050013
Project Number Z20050013
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-06-11 10:12:15THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 REQUIREMENTS FOR WATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION. CONCEPTUAL ENGINEERING PLAN SHOWS
 UNDERGROUND STORAGE CHAMBERS, WHICH STAFF SUPPORTS IN
 LIEU OF EXFILTRATION TRENCHES.
  
 2. LABEL THE ROADWAY ON THE ENGINEERING PLANS.
  
 3. PRESIDENTIAL WAY IS A PRIVATE ROAD, OWNED BY
 PRESIDENTIAL WAY ASSN INC. ACCORDING TO THE COUNTY
 PROPERTY APPRAISER?S WEBSITE. PERMISSION MAY BE NEEDED
 FROM THE OWNER FOR WORK WITHIN THE ROADWAY PARCEL.
  
 4. THE OVERALL MASTER DRAINAGE SYSTEM IS MAINTAINED BY
 BANYAN CAY DEVELOPMENT LLC ACCORDING TO SFWMD PERMIT
 50-07830-P (APPL. 161104-19). PROVIDE A LETTER FROM THE
 ENTITY INDICATING ITS ACCEPTANCE OF THE STORMWATER
 RUNOFF FROM THIS PROJECT INTO THE MASTER DRAINAGE
 SYSTEM.
  
 5. CONSIDER PROVIDING AN OUTFALL DIRECTLY INTO THE GOLF
 COURSE LAKE INSTEAD OF CONNECTING TO THE ROADWAY CATCH
 BASIN INLET. A DRAINAGE EASEMENT WILL LIKELY BE NEEDED
 IN EITHER DESIGN.
  
 6. THE BOUNDARY SURVEY PREPARED BY GEOPOINT SURVEYING,
 INC. PROVIDES A CONVERSION FACTOR OF 1.539 FEET BETWEEN
 NAVD1988 AND NGVD1929 VERTICAL DATUMS. THE CONCEPTUAL
 ENGINEERING PLANS PROVIDES A CONVERSION FACTOR OF 1.47
 FEET. PLEASE RECTIFY THIS DISCREPANCY.
  
 7. PROVIDE TYPICAL CROSS SECTIONS FOR ALL PROPERTY
 LINES BETWEEN THE PROPERTY LINE AND BACK OF SIDEWALK OR
 BUILDING FACE. SHOW HOW THE PROJECT WILL TIE INTO THE
 EXISTING GRADE AT THE PROPERTY LINE. LABEL ROAD RIGHT
 OF WAY, LANDSCAPE BUFFERS AND ANY EASEMENTS ON THE
 CROSS SECTIONS.
  
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION PRIOR
 TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  