2021-10-13 11:32:50COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 5. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW
 PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER,
 STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND
 OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL
 AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW.
 DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY,
 PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 6. FOR FORMAL ENGINEERING SUBMITTAL , PROVIDE DEDICATED
 UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS.
 7. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 8. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT
 DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW
 PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL
 BACKFLOWS.
 9. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE; AND
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO
 NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE
 CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE
 ENGINEERING PERMIT.
 10. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT
 OF WAY AND SHOW ANY CROSSINGS/CONFLICTS.
 11. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 12. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY LABEL ROAD
 RIGHT OF WAY.
 13. UPDATE PAVEMENT RESTORATION NOTE GC-8 TO CURRENT
 VERSION. CONTACT [email protected] FOR CAD FILES.
 14. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 FOLLOWUP COMMENTS:
  
 VERIFY NO CONFLICTS OF WATER UTILITIES WITH LARGE
 WOODEN AND CONCRETE TELEPHONE POLES. HISTORIC PICTURE
 SHOWS SOME AROUND NW CORNER OF PROPERTY.
 RESPONSE: THE PROPOSED 4? FIRE LINE CONNECTION WAS
 RELOCATED APPROXIMATELY 20? TO THE EAST, ELIMINATING
 THE CONFLICT WITH THE EXISTING CONCRETE POLE.
 PLEASE SHOW AND LABEL THE LARGE WOODEN AND CONCRETE
 POLES ON THE PLANS. ADD NOTATION IF THEY ARE BEING
 REMOVED OR RELOCATED.
  
 DID NOT SEE SEPARATE IRRIGATION WATER SERVICE ON CIVIL
 PLANS. WILL ONE BE NEEDED?
 RESPONSE: A 2? WELL AND A 2-HORSEPOWER PUMP WILL BE
 USED FOR IRRIGATION.
 SHOW AND LABEL THE WELL LOCATION ON PLANS.
  
 NEW COMMENTS:
  
 -DID NOT SEE LANDSCAPING PLAN. PLEASE SUBMIT AND SHOW
 UTILITIES ON IT AS WELL.
  
 -FOR FORMAL ENGINEERING SUBMITTAL: ADD SLOPE GUIDANCE
 TO SEWER LATERAL LABEL, LABEL ALL EXISTING WATER AND
 SEWER UTILITIES IN RIGHT OF WAY WITH PIPE SIZE AND
 MATERIAL TYPE, ADD NOTE THAT METER BOX IN SIDEWALK
 REQUIRES 6 INCH CONCRETE POUR, REVISE BOUNDARY OF
 SIDEWALK REPLACEMENT SO FLAG LINE IS NOT IN MIDDLE OF
 METER BOX, AND VERIFY ALL FRANCHISE UTILITIES IN
 UTILITY EASEMENT AND RIGHT OF WAY ARE SHOWN ON UTILITY
 PLAN.
  
 -WILL THE CURBING ON 45TH ST BE ALTERED? CANNOT TELL IF
 DRIVEWAY APPROACH IS SHIFTING.
  
 COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB
 PUBLIC UTILITIES, 561-494-1047, [email protected]
  
 -ADD NOTE TO CONFIRM CONDITION OF THE 6? WW LINE, REHAB
 AND REPLACE AS REQUIRED.
 -CALL OUT TAPPING TEE AND VALVE ON FIRE LINE.
 -CALL OUT THE SIZE OF THE FIRE LINE.
 -FIRE LINE COMMENT: WHY NOT GO STRAIGHT?
 -CALL OUT POINT OF SERVICE.
 -ON PROFILE SHOW ?PUBLIC? SIDE FROM TAP TO POINT OF
 SERVICE.
 -WHAT IS ?CC?? CALL OUT DRY UTILITIES.
 -PROVIDE POST CCTV OF LATERALS.
 -ADD NOTE TO CUT AND CAP ABANDONED WATER AND SEWER
 SERVICES AT THE MAIN.
 -SHOW EXISTING SEWER LATERAL FROM CLEANOUT TO EXISTING
 MAIN ON 45TH ST.
 -SHOW CONCRETE POLE NEAR 3 METER BOXES.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR