| 2021-10-13 11:32:50 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. |
| | SERVICES DEPT., 561-494-1098 [email protected] : |
| | |
| | 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE |
| | HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF |
| | CITY OF WPB DEVELOPMENT APPLICATION). |
| | 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY |
| | SEWER ARE REQUIRED. |
| | 3. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND |
| | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED |
| | AREAS. |
| | 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING |
| | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT |
| | HIM AT 561-494-2262 OR [email protected] |
| | 5. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW |
| | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, |
| | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING |
| | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY |
| | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND |
| | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH |
| | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES |
| | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, |
| | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND |
| | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL |
| | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. |
| | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN |
| | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, |
| | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION |
| | FACILITIES LOCATED ON THE RIGHT-OF-WAY. |
| | 6. FOR FORMAL ENGINEERING SUBMITTAL , PROVIDE DEDICATED |
| | UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO |
| | PROPOSED UTILITY WATER METERS. |
| | 7. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER |
| | METER AND BACKFLOW PREVENTION. |
| | 8. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT |
| | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW |
| | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL |
| | BACKFLOWS. |
| | 9. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND |
| | NPDES NOI REQUIREMENTS WILL BE ENFORCED. |
| | - AN NOI IS REQUIRED FOR PROJECTS THAT: |
| | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS |
| | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF |
| | DEVELOPMENT OR SALE; AND |
| | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE |
| | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A |
| | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). |
| | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF |
| | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION |
| | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL |
| | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT |
| | OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO |
| | NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE |
| | CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE |
| | ENGINEERING PERMIT. |
| | 10. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES |
| | OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT |
| | OF WAY AND SHOW ANY CROSSINGS/CONFLICTS. |
| | 11. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| | LEAD-FREE DESIGN. |
| | 12. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY LABEL ROAD |
| | RIGHT OF WAY. |
| | 13. UPDATE PAVEMENT RESTORATION NOTE GC-8 TO CURRENT |
| | VERSION. CONTACT [email protected] FOR CAD FILES. |
| | 14. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND |
| | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER |
| | (Z-XXXXXXXX). |
| | |
| | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR |
| | [email protected]: |
| | |
| | FOLLOWUP COMMENTS: |
| | |
| | VERIFY NO CONFLICTS OF WATER UTILITIES WITH LARGE |
| | WOODEN AND CONCRETE TELEPHONE POLES. HISTORIC PICTURE |
| | SHOWS SOME AROUND NW CORNER OF PROPERTY. |
| | RESPONSE: THE PROPOSED 4? FIRE LINE CONNECTION WAS |
| | RELOCATED APPROXIMATELY 20? TO THE EAST, ELIMINATING |
| | THE CONFLICT WITH THE EXISTING CONCRETE POLE. |
| | PLEASE SHOW AND LABEL THE LARGE WOODEN AND CONCRETE |
| | POLES ON THE PLANS. ADD NOTATION IF THEY ARE BEING |
| | REMOVED OR RELOCATED. |
| | |
| | DID NOT SEE SEPARATE IRRIGATION WATER SERVICE ON CIVIL |
| | PLANS. WILL ONE BE NEEDED? |
| | RESPONSE: A 2? WELL AND A 2-HORSEPOWER PUMP WILL BE |
| | USED FOR IRRIGATION. |
| | SHOW AND LABEL THE WELL LOCATION ON PLANS. |
| | |
| | NEW COMMENTS: |
| | |
| | -DID NOT SEE LANDSCAPING PLAN. PLEASE SUBMIT AND SHOW |
| | UTILITIES ON IT AS WELL. |
| | |
| | -FOR FORMAL ENGINEERING SUBMITTAL: ADD SLOPE GUIDANCE |
| | TO SEWER LATERAL LABEL, LABEL ALL EXISTING WATER AND |
| | SEWER UTILITIES IN RIGHT OF WAY WITH PIPE SIZE AND |
| | MATERIAL TYPE, ADD NOTE THAT METER BOX IN SIDEWALK |
| | REQUIRES 6 INCH CONCRETE POUR, REVISE BOUNDARY OF |
| | SIDEWALK REPLACEMENT SO FLAG LINE IS NOT IN MIDDLE OF |
| | METER BOX, AND VERIFY ALL FRANCHISE UTILITIES IN |
| | UTILITY EASEMENT AND RIGHT OF WAY ARE SHOWN ON UTILITY |
| | PLAN. |
| | |
| | -WILL THE CURBING ON 45TH ST BE ALTERED? CANNOT TELL IF |
| | DRIVEWAY APPROACH IS SHIFTING. |
| | |
| | COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB |
| | PUBLIC UTILITIES, 561-494-1047, [email protected] |
| | |
| | -ADD NOTE TO CONFIRM CONDITION OF THE 6? WW LINE, REHAB |
| | AND REPLACE AS REQUIRED. |
| | -CALL OUT TAPPING TEE AND VALVE ON FIRE LINE. |
| | -CALL OUT THE SIZE OF THE FIRE LINE. |
| | -FIRE LINE COMMENT: WHY NOT GO STRAIGHT? |
| | -CALL OUT POINT OF SERVICE. |
| | -ON PROFILE SHOW ?PUBLIC? SIDE FROM TAP TO POINT OF |
| | SERVICE. |
| | -WHAT IS ?CC?? CALL OUT DRY UTILITIES. |
| | -PROVIDE POST CCTV OF LATERALS. |
| | -ADD NOTE TO CUT AND CAP ABANDONED WATER AND SEWER |
| | SERVICES AT THE MAIN. |
| | -SHOW EXISTING SEWER LATERAL FROM CLEANOUT TO EXISTING |
| | MAIN ON 45TH ST. |
| | -SHOW CONCRETE POLE NEAR 3 METER BOXES. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | |
| | |
| |