2020-10-30 08:11:07THE FOLLOWING COMMENTS ARE FROM RICK ROSSANO, PROJECT
 COORDINATOR, ENGINEERING SERVICES DEPT., DIRECT: (561)
 494-1098 [email protected]
  
 1. PLEASE ADD ADDRESS TO COVER SHEET.
 2. PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929) ON SHEETS C-8 AND
 C-11.
 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS ON SHEETS C-8 AND C-11.
 CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER AND PER
 FAC 64-E.008 FOR WATER.
 4. PLEASE CLEAN UP ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 5. SHEET C-14: ADD BMP ITEMS SHOWN ON SWPPP DETAIL
 SHEET C-15 ? TRUCK WASHDOWN PAD, ETC. ALSO ADD FILTER
 FABRIC TO DRAINAGE INLET JUST WEST OF PROJECT ENTRANCE
 ON SOUTH SIDE OF 45TH ST.
  
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -DID NOT SEE SEPARATE IRRIGATION WATER SERVICE ON CIVIL
 PLANS. WILL ONE BE NEEDED?
  
 -PLEASE ADD SIZING TO WATER MAIN LABEL. IT IS MISSING
 FROM SOME OF THE PLANS.
  
 -SHOW AND LABEL DISTANCE BETWEEN FIRE WATER SERVICE AND
 WASTEWATER SERVICE IN ROW.
  
 -PLEASE ADD ADDRESS TO SHEET C-8.
  
 -BACKFLOW ASSEMBLIES MAY NOT BE LOCATED IN UTILITY
 EASEMENTS. APPEARS TO BE IN 10? UE ? PLEASE RELOCATE.
  
 -VERIFY NO CONFLICTS OF WATER UTILITIES WITH LARGE
 WOODEN AND CONCRETE TELEPHONE POLES. HISTORIC PICTURE
 SHOWS SOME AROUND NW CORNER OF PROPERTY.
  
 -WATER MAIN MAY BE FURTHER SOUTH THAN SHOWN ON PLANS.
 MAY HELP TO VERIFY LOCATION SO WILL KNOW IF OUT OF
 ROADWAY FOR SURE.
  
 -WATER SERVICE STANDARD DETAILS ARE OLD REVISION ?
 PLEASE REPLACE WITH LATEST REVISION.
  
 -EXISTING DOMESTIC WATER SERVICE DOES NOT HAVE UTILITY
 BILLING ACCOUNTS SETUP FOR ACTIVE USAGE. WOULD HAVE TO
 SETUP ACCOUNTS AND PAY ANY APPLICABLE FEES, CHARGES,
 AND DEPOSITS.
  
 -IF REPLACING SIDEWALK, NEED TO RELOCATE METER BOX OUT
 OF SIDEWALK AND INTO GRASSY AREA WITHIN UTILITY
 EASEMENT. EXISTING ASSOCIATED BACKFLOW ASSEMBLY NEEDS
 TO BE REPLACED TO LEAD-FREE COMPLIANT RP ASSEMBLY ?
 UPDATE C-8 NOTE 5 THAT ALL CONTAINMENT BACKFLOW
 ASSEMBLIES MUST BE LEAD-FREE, USC APPROVED, AND RP TYPE
 ON THE DOMESTIC WATER LINE.
  
 -ADD WATER DEMAND LOS INFORMATION TO WATER & UTILITY
 PLANS.
  
 -SHEET C-8 SHOWS ELEVATIONS, BUT DOES NOT HAVE DATUM
 INFORMATION INCLUDED. PLEASE ADD.
  
 -EXISTING UTILITY EASEMENT APPEARS TO OVERLAP WITH
 LANDSCAPE BUFFER ON NORTH SIDE OF PROPERTY. VERIFY
 THERE WILL BE NO CONFLICTS WITH TREES AND METER BOXES,
 PIPING, AND BACKFLOW ASSEMBLIES.
  
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPT., DIRECT: (561) 494-1098 [email protected]
  