| Plan Review Notes For Project Z20040014 |
| Project Number |
Z20040014 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2020-11-13 16:56:47 | TRAFFIC COMMENTS: | | | 1. PROVIDE FDOT ACCESS MANAGEMENT APPROVAL LETTER, ONCE | | | OBTAINED | | | | | | SITE PLAN COMMENTS: | | | 2. PROVIDE A MINIMUM OF 4-FOOT LANDSCAPE BUFFER BETWEEN | | | THE CONCRETE SIDEWALK AND THE STREET CURB ALONG 45TH | | | ST. OTHERWISE, PROVIDE CORRESPONDENCE/DOCUMENTATION | | | FROM THE COUNTY REFUSING IMPLEMENTATION OF SUCH | | | LANDSCAPE BUFFER, ONCE RECEIVED | | | 3. PARKING SPACES ON THE NORTH SIDE OF THE PROPOSED | | | DEVELOPMENT SHALL BE REMOVED IN ORDER TO AVOID PARKED | | | VEHICLES BACKING UNTO TRAVEL LANES. THIS IS A CRITICAL | | | SAFETY AND CIRCULATION ISSUE. | | | 4. FOR THE PROPOSED PARKING SPACES ON THE NORTH SIDE, | | | PROVIDE AUTOTURN ANALYSIS SHOWCASING VEHICLES | | | BACKING-OUT AND THEN HEADING WESTBOUND, AS WELL AS | | | EASTBOUND | | | 5. IN ORDER TO PROVIDE MORE MANEUVERING SPACE FOR THE | | | VEHICLES PARKED ON THE NORTH SIDE OF THE PROPOSED | | | DEVELOPMENT, CONSIDER SHIFTING THE TRAVEL LANES AND/OR | | | EXISTING EAST DRIVEWAY FURTHER NORTH. IN CASE, UTILIZE | | | THE EXISTING CURB CUT LOCATED AT THE BEGINNING OF THE | | | TURN LANE ON MILITARY TRAIL | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
| |
Print |
|