2020-08-04 14:22:11THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 7/29/2020 SUBMITTAL PACKAGE.
  
 1. [NOT SATISFIED. CAN BE MADE A CONDITION OR APPROVAL
 FOR THE SITE PLAN] 45TH ST. IS MAINTAINED BY PALM BEACH
 COUNTY AND MILITARY TRAIL IS MAINTAINED BY FDOT.
 APPROVALS FROM THESE AGENCIES WILL BE NEEDED BEFORE AN
 ENGINEERING PERMIT WILL BE ISSUED.
  
 2. [SATISFIED] CHECK WITH PALM BEACH COUNTY WHETHER
 THEY PREFER THE SIDEWALK ALONG 45TH ST TO BE
 CONSTRUCTED AT BACK OF CURB OR AT THE FUTURE
 RIGHT-OF-WAY LINE.
  
 2.1 [NEW COMMENT] PROVIDE A CROSS SECTION OF THE RIGHT
 TURN LANE ON 45TH ST. FROM EXISTING EDGE OF PAVEMENT TO
 PROPOSED RIGHT OF WAY LINE.
  
 3. [SATISFIED - RESPONSE INDICATED OWNER PREFERS FULL
 DEPTH PARKING STALLS] CONSIDER REDUCING THE PARKING
 STALL DEPTHS BY TWO FEET AND PROVIDE 2 FEET OF OVERHANG
 IN ADDITIONAL LANDSCAPE WIDTH.
  
 4. [NOT SATISFIED. CAN BE MADE A CONDITION OR APPROVAL
 FOR THE SITE PLAN] PROVIDE APPROVAL/ACCEPTANCE FROM
 FPL, FPUC AND ANY OTHER UTILITY WITH INTERESTS IN THE
 EASEMENTS/RIGHT-OF-WAY ALONG THE NORTHWEST CORNER OF
 THE SITE WHERE THE DETENTION AREA IS PROPOSED.
  
 4.1 [NEW COMMENT] FOR THE DRY DETENTION AREA, PROVIDE
 CROSS SECTIONS FROM EAST PROPERTY LINE TO WEST PROPERTY
 LINE AND FROM NORTH PROPERTY LINE TO 5 FEET SOUTH OF
 THE DRY DETENTION AREA.
  
 5. [SATISFIED] REMOVE EXISTING DRIVEWAY ACCESS POINTS
 THAT WILL NOT BE NEEDED AND RESTORE STANDARD SIDEWALK
 AND CURB AND GUTTER.
  
 6. [NOT SATISFIED] LANDSCAPING PLANS SHOW LANDSCAPING
 WITHIN THE FUTURE RIGHT OF WAY OF 45TH STREET.
 .
 7. [REQUIRED FOR ENGINEERING PERMIT SUBMITTAL] DRAINAGE
 SYSTEM TO MEET SFWMD ERP CRITERIA.
  
 7.1 [NEW COMMENT] PROVIDE CONCEPTUAL DRAINAGE PLANS FOR
 THE FULLY DEVELOPED SITE IN ORDER TO SET MINIMUM
 ELEVATIONS FOR PERIMETER BERM, FINISHED FLOOR
 ELEVATION, PARKING LOTS, ETC. AND MAXIMUM PEAK
 DISCHARGE RATE. INCLUDE LAND USE AND DESIGN ASSUMPTIONS
 FOR EACH PARCEL.
  
 8. [NEW COMMENT] INCLUDE ALL HATCH PATTERNS SHOWN ON
 THE CONCEPTUAL ENGINEERING PLANS IN THE LEGEND.
  
 9. [NEW COMMENT] WHAT IMPACT WILL THE WELLFIELD
 PROTECTION ZONES HAVE ON DEVELOPMENT AND CONSTRUCTION?
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 4. SITE IS WITHIN THE JURISDICTIONAL LIMITS OF NPBCID
 AND AN APPROVAL LETTER FROM NPBCID WILL BE NEEDED PRIOR
 TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  
  