Plan Review Notes For Project Z20030026
Project Number Z20030026
Review Stop STORM
Sequence Number 4
Notes
Date Text
2020-12-02 09:32:02THE FOLLOWING COMMENTS ARE BASED ON THE REVIEW OF THE
 10/16/2020 DISTRIBUTED PACKAGE.
  
 1. RELOCATE DRAINAGE STRUCTURE NO. NO. 3 OUT OF THE
 PROPOSED RIGHT OF WAY.
  
 2. WEST INVERT ELEVATION AT STRUCTURE NO. 3 LABELED AS
 EAST INVERT.
  
 3. ADD A WEIR TO THE WEST INVERT ELEVATON OF STRUCTURE
 NO. 3 AND LOWER THE WEST INVERT ELEVATON OF STRUCTURE
 NO. 2 TO ALLOW ROOF DRAINAGE TO FLOW TOWARD THE
 EXFILTRATION TRENCH FOR TREATMENT AND PEAK FLOW
 ATTENUATION.
  
 4. ADD A PRB TO STRUCTURE NO. 1 TO EXTEND THE LIFE OF
 THE EXFILTRATION TRENCH.
  
 5. SURVEY VERTICAL DATUM IS LISTED AS NAVD1988. THE
 CIVIL ENGINEERING PLANS LIST THE VERTICAL DATUM AS
 NGVD1929 ALTHOUGH THEY SHOW THE SAME VALUE FOR EXISTING
 SPOT GRADES AS THE SURVEY. THE VERTICAL DATUM SHALL BE
 CONSISTENT FOR ALL OF THE PLANS. THE CITY'S OFFICIAL
 VERTICAL DATUM IS NGVD1929 BUT HAS ALLOWED THE USE OF
 NAVD1988 PROVIDED THE CONVERSION BETWEEN THE TWO DATUMS
 IS LISTED ALONG WITH THE VERTICAL DATUM ON EVERY SHEET
 WITH ELEVATION INFORMATION.
  
 6. DRAINAGE REPORT:
 A. THE PROPOSED CONDITIONS CASCADE MODEL RESULTS SHOW
 DISCHARGE WHEN THE HEADWATER STAGE IS LOWER THAN THE
 UPSTREAM PIPE INVERT ELEVATION.
  
 B. THE EXISTING CONDITIONS CACADE MODEL RESULTS FOR THE
 5-YEAR EVENT SHOW CONSTANT CURRENT DISCHARGE OF 18.46
 CFS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  