Plan Review Notes
Plan Review Notes For Project Z20030026
Project Number Z20030026
Review Stop STORM
Sequence Number 2
Notes
Date Text
2020-08-25 00:42:03THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 AUGUST 5, 2020 SUBMITTAL REVIEW PACKAGE:
  
 1. THE ENGINEERING PLANS INCLUDE EXFILTRATION TRENCH
 DETAILS BUT THE DRAINAGE PLAN DOES NOT SHOW ANY
 DRAINAGE STRUCTURES OR EXFILTRATION TRENCHES. [NOT
 SATISFIED] THERE IS NO NEED TO INCLUDE DETAILS FOR
 ITEMS THAT ARE NOT PART OF THE PLAN.
  
 2. PROVIDE CROSS SECTIONS FROM ROAD CENTERLINES TO
 FACES OF BUILDING. [PARTIALLY SATISFIED] LABEL S. DIXIE
 HWY ON SECTION B-B.
  
 2.1 [NEW COMMENT] REVIEW FL BUILDING CODE 1804.4 SITE
 GRADING WITH REGARDS TO THE GRADING AROUND THE
 BUILDING.
  
 2.2 [NEW COMMENT] SHOW SWALES ALONG SOUTH AND EAST
 PROPERTY LINES TO PREVENT DIRECT STORMWATER RUNOFF TO
 THE SIDEWALK AND ADJACENT PROPERTY.
  
 3. PROVIDE SWALES ON N, W AND S SIDES OF BUILDING TO
 CAPTURE STORMWATER RUNOFF AND PROMOTE INFILTRATION.
 (SATISFIED]
  
 4. SHOW LOCATIONS OF THE ROOF DRAIN DOWNSPOUTS. THEY
 SHOULD DISCHARGE TO PERVIOUS AREAS OR BE CONNECTED TO
 THE DRAINAGE SYSTEM. [SATISFIED] SECOND PART OF
 COMMMENT CAN BE CONDIITONAL APPROVAL OF THE SITE PLAN.
 THE FIRST PART OF COMMENT CAN BE ADDRESSED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 5. BELVEDERE ROAD IS MAINTAINED BY PALM BEACH COUNTY.
 APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY
 IMPROVEMENTS WITHIN BELVEDERE ROAD RIGHT OF WAY.[NOT
 SATISFIED] SEE ADDITIONAL COMMENTS RELATED TO THE
 BELVEDERE ROAD R/W BELOW.
  
 6. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. [NOT SATISFIED] BELOW IS SOME BUT NOT ALL OF
 THE SFWMD CRITERIA THAT WILL NEED TO BE MET.
 A. OFFISTE DISCHARGE TO BE CONTROLLED UPTO AND
 INCLUDING THE 25-YEAR 3-DAY STORM EVENT. \
 B. POST-DEVELOPMENT DISCHARGE RATE CANNOT EXCEED
 PRE-DEVELOPMENT DISCHARGE RATE.
 C. WATER QUALITY TREATMENT TO BE PROVIDED PER SFWMD
 CRITERIA OF THE LARGER OF 1" OF RUNOFF OR 2.5" TIMES
 PERCENT IMPERVIOUSNESS.
 D. RETENTION/DETENION AREAS TO INCLUDE MECHANISMS FOR
 RETURNING THE GROUNDWATER LEVEL TO CONTROL ELEVATION.
  
 NEW COMMENTS:
 7. REMOVE THE DRIVEWAY FLARES BEHIND THE SIDEWALK.
  
 8. SHOW THE REPLACEMENT OF THE SIDEWALK WHERE THE
 DRAINAGE PIPE IS BEING REMOVED.
  
 9. REPLACE SIDEWALK ACROSS DRIVEWAY APRON IF SLOPES DO
 NOT MEET ADA CRITERIA.
  
 10. MOVE THE HIGHPOINT OF THE DRIVEWAY TO THE BACK OF
 SIDEWALK.
  
 11. THE IRRIGATION PLAN SHOWS PART OF THE IRRIGATION
 SYSTEM OUTSIDE THE PROPERTY LINE.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]