| 2020-04-08 18:45:57 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE ENGINEERING PLANS INCLUDE EXFILTRATION TRENCH |
| | DETAILS BUT THE DRAINAGE PLAN DOES NOT SHOW ANY |
| | DRAINAGE STRUCTURES OR EXFILTRATION TRENCHES. |
| | |
| | 2. PROVIDE CROSS SECTIONS FROM ROAD CENTERLINES TO |
| | FACES OF BUILDING. |
| | |
| | 3. PROVIDE SWALES ON N, W AND S SIDES OF BUILDING TO |
| | CAPTURE STORMWATER RUNOFF AND PROMOTE INFILTRATION. |
| | |
| | 4. SHOW LOCATIONS OF THE ROOF DRAIN DOWNSPOUTS. THEY |
| | SHOULD DISCHARGE TO PERVIOUS AREAS OR BE CONNECTED TO |
| | THE DRAINAGE SYSTEM. |
| | |
| | 5. BELVEDERE ROAD IS MAINTAINED BY PALM BEACH COUNTY. |
| | APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY |
| | IMPROVEMENTS WITHIN BELVEDERE ROAD RIGHT OF WAY. |
| | |
| | 6. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |