Plan Review Notes
Plan Review Notes For Project Z20030026
Project Number Z20030026
Review Stop L
Sequence Number 1
Notes
Date Text
2020-04-07 15:59:28FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 2835 BELVEDERE RD Z20030026
 APRIL 7, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PROVIDE A TREE DISPOSITION CHART SHOWING THE 2 PALMS
 TO BE REMOVED, AND 50 SQ FT EACH MITIGATION DUE.
  
 2. CORRECT THE CALCULATIONS FOR REQUIRED MINIMUM SHADE
 TREE AND FLOWERING TREE REQUIREMENTS PER SECTION
 94-443(C)(2)B. BASED ON REQUIRED OPEN SPACE OF 40%.
 9429 SQ FT REQUIRES 7 SHADE TREES AND 2 FLOWERING
 TREES.
  
 3. PROVIDE THE REQUIRED TERMINAL LANDSCAPE ISLAND WITH
 8 FEET LANDSCAPE WIDTH AT THE END OF EACH ROW OF
 PARKING ALONG THE NORTH BUFFER. THE 5 FEET OF REQUIRED
 LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL ISLAND,
 BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED. THE
 REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE
 BUFFER TREE REQUIREMENT.
  
 4. SHORTEN THE PARKING AREA TO ELIMINATE THE TURN
 AROUND FROM ENCROACHING INTO THE NORTH LANDSCAPE
 BUFFER.
  
  
 5. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75
 PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED
 WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL
 BE CATEGORY 1 SHADE TREES. SHOW THE PERCENTAGE OF
 CATEGORY 1 TREES PROVIDED FOR THE REQUIRED LANDSCAPE
 AREAS AS REQUIRED BY SECTION 94-443(C)(3) FOR TERMINAL
 AND INTERIOR ISLANDS. THERE ARE 10 REQUIRED TREES.
  
 6. PROVIDE A PLAN SHOWING THE PARKING LANDSCAPE AREAS
 COUNTED TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND
 (4) AND PROVIDE CALCULATIONS. PROVIDE THE TOTAL
 REQUIRED AND PROVIDED AS ONE TOTAL FOR BOTH SECTIONS.
  
 7. STAFF SUGGESTS REDUCING THE PAVED AREAS FOR PARKING
 SPACES AND USING CURBS INSTEAD OF WHEEL STOPS TO ALLOW
 FOR PERVIOUS LANDSCAPE AREA AT THE OVERHANG. THIS ALSO
 ALLOWS MORE LANDSCAPE AREA FOR SUPPORTING THE ROOT
 ZONES OF THE TREES.
  
 8. BUFFER LENGTHS REQUIRE ONE TREE PER 30 FEET OR
 PORTION THEREOF. WEST BUFFER LENGTH IS 101.565 (89.70+
 11.865) AND REQUIRES 4 TREES, SOUTH BUFFER LENGTH IS
 231.685 (219.82 + 11.865) AND REQUIRES 8 TREES, NORTH
 BUFFER REQUIRES 8 TREES, AND EAST BUFFER REQUIRES 4
 TREES. MAKE CORRECTIONS AND ADD EQUIVALENT OF 4 TREES
 TO EAST BUFFER.
  
 9. ADJUST TREE SIZE REQUIREMENT IN CHART ON L-2.1 TO
 MINIMUM OF 12 FEET IN HEIGHT.
  
  
 10. UPDATE THE DESIGN OPTIONS CHART FOR FLORIDA
 FRIENDLY LANDSCAPE REQUIREMENTS PER SECTION 94-442(G)
 TO THE CURRENT CODE AND PROVIDE THE REQUIRED 50 POINTS.
  
 11. ADD A SECTION IN THE LANDSCAPE DATA CHART TO COMPLY
 WITH SECTION 94-445 L. PLANT SPECIES. A MINIMUM OF 60
 PERCENT OF PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE
 OR DROUGHT TOLERANT SPECIES SELECTED FROM THE CITY LIST
 OR THE LIST OF SPECIES IN THE MOST RECENT EDITION OF
 SOUTH FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES.
 PROVIDE THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT
 TOLERANT PLANTS BASED ON FINAL PLANT LIST.
  
 12. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE LANDSCAPE
 PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING.
  
 13. SHOW LOCATIONS OF ALL PROPOSED WATER, SEWER AND
 DRAINAGE LINES ON THE LANDSCAPE PLAN.
  
 14. PROVIDE A DETAIL AND LOCATIONS OF ROOT BARRIERS TO
 SEPARATE LANDSCAPING FROM UTILITY LINES.
  
 15. PROVIDE SCREENING FOR ALL GROUND MOUNTED VALVES AND
 EQUIPMENT.
  
 16. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE
 LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE
 LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH
 TREES IN THE PARKING AREA LANDSCAPE ISLANDS.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved