2020-09-21 09:38:081. PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929) ON ALL CIVIL PLAN
 SHEETS.
 2. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 (UNABLE TO LOCATE ON RESUBMITTAL).
 3. PROVIDE CCTV VIDEO OF EXISTING SANITARY FROM CITY
 SSMH1336 (POINT OF PROPOSED SANITARY CONNECTION TO CITY
 FACILITIES, THEN GOING EAST APPROX. 90 FT. TO NEXT CITY
 SSMH3098). ; REQUIREMENT OF SITE PLAN APPROVAL.
 4. PER DISCUSSIONS WITH PUBLIC UTILITIES, PLEASE EXTEND
 EXISTING GRAVITY SANITARY SYSTEM 75 FT. WEST TO A NEW
 SANITARY MANHOLE, THEN SOUTH TO A NEW A SECOND SANITARY
 MANHOLE ON SITE IN DRIVEWAY NEAR THE NORTHEAST CORNER
 OF THE PROPERTY. YOUR PRIVATE ONSITE FORCEMAIN WILL
 CONVEY SEWER TO THE SECOND MANHOLE (CITY?S POINT OF
 SERVICE). A MARKUP AERIAL VIEW OF THE PROPOSED LAYOUT
 IS AVAILABLE.
 5. PLEASE RESPOND TO ALL COMMENTS IN WRITING.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, CITY OF WPB
 ENGINEERING SERVICES (561) 494-1098 [email protected]
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR
 CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262
 [email protected]
  
 -NEED UTILITY EASEMENTS FOR THE WATER METERS AND
 SERVICE LINES ON PRIVATE PROPERTY. BACKFLOW ASSEMBLIES
 SHOULD BE OUT OF THE UTILITY EASEMENTS.
 -ALL CONTAINMENT BACKFLOW ASSEMBLIES FOR THIS PROPERTY
 NEED BE RP TYPE.
 -ON FORMAL ENGINEERING SUBMITTAL LABEL WATER SERVICE
 LINE PIPING WITH SIZE AND MATERIAL TYPE.
 -UTILITY PLAN SHOWS EXISTING METERED WATER SERVICE WITH
 NO LABEL AND NOTE 2 SAYS EXISTING UTILITIES ARE TO BE
 REMOVED BY CONTRACTOR, BUT DEMO PLAN SAYS IT WILL
 REMAIN. PLEASE CORRECT CONTRADICTION.
 -REFERENCED PRESSURE PIPE STANDARD DETAILS ARE OLD
 REVISION ? PLEASE UPDATE TO NEWEST REVISION.
 -NEW WATER LINE TAPS MAY REQUIRE PAVEMENT RESTORATION
 IN ACCORDANCE WITH SD P-4.
 -WPB UTILITIES RECOMMENDS DUAL/PARALLEL BACKFLOW
 ASSEMBLIES ON DOMESTIC/GENERAL WATER SERVICES TO
 MINIMIZE WATER OUTAGE DURING BACKFLOW ASSEMBLY
 MAINTENANCE.
 -REMOVE DUAL WATER SERVICE AND FIRELINE STANDARD
 DETAILS IF THEY WILL NOT BE USED.
 -SOME OF THE PLANS SAY JAN2020. IS THAT THE MOST RECENT
 REVISION DATE OR WHEN PLANS WERE CREATED?
 -WILL THE PROPERTY NEED CITY WATER SERVICE FOR
 IRRIGATION?
 -BACKFLOW ASSEMBLIES NEED AT LEAST 18? CLEARANCE FROM
 BUSHES FOR MAINTENANCE.
 -KEEP AT LEAST 3? DISTANCE BETWEEN
 METER-BOXES/BACKFLOW-ASSEMBLIES AND TREES. ALSO APPLY
 ROOT BARRIERS AS NECESSARY TO PREVENT UTILITY DAMAGE.
  