| Plan Review Notes For Project Z20030016 |
| Project Number |
Z20030016 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-09-22 00:36:09 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 8/27/2020 ROUTED SUBMITTAL PACKAGE. | | | | | | 1. A SEPARRATE CONTROL STRUCTION WILL BE NEEDED FOR THE | | | STORMWATER MANAGEMENT SYSTEM. | | | | | | 2. MOVE THE EXFILTRATION TRENCH CLOSER TO WHERE THE | | | CONTROL STRUCTURE WILL BE. | | | A. CAN THE EXFILTRATION TRENCH SHOWN BETWEEN STRUCTURES | | | 2 AND 3 BE MOVED TO BETWEEN STRUCTURES 9 AND 10 AND THE | | | PIPE BETWEEN STRUCTURES 2 AND 3 BE ELIMINATED? | | | B. CAN SOME OF THE EXFILTRATION TRENCH BETWEEN | | | STRUCTURES 2 AND 11 BE MOVED TO BETWEEN STRUCTURES 7 | | | AND 8 AND/OR BETWEEN STRUCTURES 8 AND 9. | | | | | | 3. LABEL WHICH STORM INVERTS ARE TO BE COVERED BY A | | | PRB. | | | | | | 4. DRAINAGE SYSTEM SHOWN ON THE UTILITY PLAN DOES NOT | | | MATCH WHAT IS SHOWN ON THE PGD PLAN. | | | | | | 5. SHOW MILL AND RE-SURFACE LIMITS ON THE UTILITY PLAN | | | FOR THE TRANCH CUTS ON 13TH ST. | | | | | | 6. PROVIDE SHEET 1 OF 2 OF THE SURVEY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | | | | | | | | | | | | | | | | |
| |
Print |
|