2020-10-06 17:08:43FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER
 561-822-1462
 PROJECT: 1225 PALM BEACH LAKES Z20030016
 OCTOBER 6, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PROVIDE THE FOLLOWING CORRECTIONS TO TREE
 DISPOSITION CHART:
 ? SATISFIED. PROVIDE REASON WHY MAHOGANY #15 IN GOOD
 CONDITION CANNOT BE RELOCATED.
 ? SATISFIED. CORRECT NOTE AT BOTTOM OF DISPOSITION
 CHART TO REMOVE WAWA.
 ? SATISFIED. CORRECT SHEET L-01 TO IDENTIFY REMOVALS
 WITH AN X AND RELOCATES WITH AN R SO THEY ARE CLEARLY
 IDENTIFIABLE.
 ? SATISFIED. REVISE THE PROVIDED MITIGATION AFTER THE
 PLAN IS REVISED FOR THE COMMENTS BELOW.
  
  
 2. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE
 ISLAND WITH 8 FEET LANDSCAPE WIDTH AT THE END OF EACH
 ROW OF PARKING ALONG THE WEST BUFFER. THE 5 FEET OF
 REQUIRED LANDSCAPE BUFFER CAN BE A PART OF THE TERMINAL
 ISLAND, BUT THE 8 FEET INSIDE CURB MUST BE PROVIDED.
 THE REQUIRED TREE MUST BE PROVIDED IN ADDITION TO THE
 BUFFER TREE REQUIREMENT.
  
 3. SATISFIED. PROVIDE THE REQUIRED TERMINAL LANDSCAPE
 ISLAND AND REQUIRED TREE AT THE NORTH END OF THE ROW OF
 PARKING ON THE WEST SIDE OF BUILDING C.
  
 4. SATISFIED. SHOW THAT THE SQUARE FOOTAGE OF LANDSCAPE
 AREA ADJACENT TO THE PARKING SPACE IS AT LEAST 140 SQ
 FT FOR THE LANDSCAPE ISLANDS THAT HAVE A MODIFIED
 RADIUS.
  
 5. PROVIDE THE REQUIRED WEST LANDSCAPE BUFFER AT THIS
 TIME IF THE PROPOSED CROSS ACCESS LANE IS NOT GOING TO
 BE CONSTRUCTED WITH THE SITE. IF IT IS TO BE A LATER
 DATE, PROVIDE AN ALTERNATE PLAN FOR THE AREA FOR WHEN
 THE ACCESS WILL BE CONSTRUCTED.
  
  
 6. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A
 MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO
 BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING
 AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE
 PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE
 REQUIRED LANDSCAPE AREAS AS REQUIRED BY SECTION
 94-443(C)(3) FOR TERMINAL AND INTERIOR ISLANDS. THERE
 ARE 17 REQUIRED ISLANDS AND TREES, MEANING 13 MUST BE
 CATEGORY 1.
  
  
 7. SATISFIED. THE PARKING SPACES APPEAR TO BE 18 FEET
 IN LENGTH WITH A CURB AND OVERHANG INTO LANDSCAPE
 AREAS. STAFF SUGGESTS REDUCING THE PAVED AREAS FOR
 PARKING SPACES AND PLACING THE CURBS AT 16 FEET TO
 ALLOW FOR ADDITIONAL PERVIOUS LANDSCAPE AREA AT THE
 OVERHANG. THIS ALSO ALLOWS MORE LANDSCAPE AREA FOR
 SUPPORTING THE ROOT ZONES OF THE TREES.
  
 8. LANDSCAPE BUFFERS:
  
 ? NOT SATISFIED. WEST BUFFER REQUIRES 8 TREES, IF
 ALEXANDER PALMS ARE TRIPLE TRUNK, THEY CAN COUNT FOR 1
 TREE EACH. IF TREE #27 IS COUNTED TOWARD NORTH BUFFER
 REQUIREMENT, THEN THE PLAN ONLY PROVIDES 5 BUFFER
 TREES.
 OFFSITE TREES #17-23 CANNOT BE COUNTED TOWARD ONSITE
 BUFFER REQUIREMENTS. 3 TRIPLE ALEXANDER PALMS COUNT AS
 3 TREES. NEED 5 MORE QUALIFYING TREES.
 ? SATISFIED. SOUTH BUFFER LENGTH REQUIRES 11 TREES, AND
 PROVIDES 11 TREES.
 ? SATISFIED. NORTH BUFFER REQUIRES 11 TREES, 11 TREES
 PROVIDED IF #27 IS COUNTED.
 ? NOT SATISFIED. EAST BUFFER REQUIRES 8 TREES. FOR THE
 VARIANCE, THE NARRATIVE STATES THERE ARE 8 ADDITIONAL
 TREES PROVIDED ON SITE TO COMPENSATE. THESE MUST BE
 IDENTIFIED IN SOME WAY ON THE PLAN.
 THIS WAS NOT ADDRESSED IN THE COMMENT RESPONSES.
  
 9. SATISFIED. THE PROPOSED PLAN COUNTS EXISTING TREES
 IN THE LANDSCAPE BUFFER REQUIREMENTS. THESE TREES ARE
 IN LOCATIONS WHERE CONSTRUCTION OF PAVEMENT, CURBS AND
 UTILITIES WILL BE IN CLOSE PROXIMITY. INSTRUCTIONS NEED
 TO BE INCLUDED ON HOW THE CONTRACTOR IS TO HAVE A
 QUALIFIED CERTIFIED ARBORIST AVAILABLE AS NEEDED TO
 ASSURE THE TREE ROOT SYSTEMS ARE PROTECTED AND NOT
 DAMAGED.
  
 10. SATISFIED. PROVIDE A DETAIL AND LOCATIONS OF ROOT
 BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY LINES.
  
 11. SATISFIED. SHOW THE LOCATIONS OF ALL SITE LIGHTING
 ON THE LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE
 LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH
 TREES IN THE PARKING AREA LANDSCAPE ISLANDS.
  
 12. SATISFIED. PER SECTION 94-452 ROADWAY
 BEAUTIFICATION, PROVIDE A PLAN FOR THE REPLACEMENT OF
 THE ROYAL PALMS IN THE RIGHT OF WAY, AND PROVIDE A
 SEPARATE SECTION ON THE PLANT LIST FOR THEM. PALM BEACH
 LAKES BOULEVARD IS PB COUNTY RIGHT OF WAY, AND THE CITY
 HAS A LANDSCAPE MAINTENANCE AGREEMENT WITH THE COUNTY.
 IRRIGATION MAY NOT BE WORKING IN THE RIGHT OF WAY, SO
 IRRIGATION SHOULD BE PROVIDED FROM THE SITE. A
 MAINTENANCE AGREEMENT SHOULD BE WORKED OUT, AS THE
 LANDSCAPE MAINTENANCE PROVIDED BY THE CITY MAY NOT BE
 ADEQUATE TO ENHANCE THE PROJECT.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION PERMITTED AND INSTALLED.
 THIS WILL BE THROUGH A SEPARATE MAINTENANCE AGREEMENT
 WITH THE CITY TRANSFERRING THE MAINTENANCE FROM THE