| 2020-04-08 18:54:38 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. PALM BEACH LAKES BLVD. IS MAINTAINED BY PALM BEACH |
| | COUNTY. . APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY |
| | IMPROVEMENTS WITHIN BELVEDERE ROAD RIGHT OF WAY. |
| | |
| | 2. LIST THE VERTICAL DATUM AND CONVERSION EQUATION TO |
| | NGVD 1929 ON EVERY SHEET WITH ELEVATION INFORMATION. |
| | |
| | 3. PROVIDE DRAINAGE AGREEMENT WITH PARCEL ?D? OWNER TO |
| | CONNECT TO ITS DRAINAGE SYSTEM AS WELL AS TO TAKE |
| | RUNOFF FROM ITS SITE INTO THE NEW DRAINAGE SYSTEM. |
| | |
| | 4. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. |
| | |
| | 5. ROOF DRAINS SHOULD DRAIN TO PERVIOUS AREAS OR BE |
| | CONNECTED TO THE DRAINAGE SYSTEM. |
| | |
| | 6. CONSIDER REDUCING THE PARKING SPACE DEPTHS AND |
| | PROVIDE 2 FEET OF GRASSED OVERHANG: |
| | - EAST OF BUILDING ?B? |
| | - ALONG PALM BEACH BLVD RIGHT OF WAY |
| | |
| | 7. CONSIDER MOVING INLETS AWAY FROM DRIVEWAY ENTRANCES |
| | SO THAT THE DRIVEWAYS WILL NOT BE BLOCKED IF THE |
| | PARKING LOT FLOODS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |