Plan Review Notes
Plan Review Notes For Project Z20030013
Project Number Z20030013
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-04-08 18:41:01THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
  
 1. LOCATE THE TOP OF BANK, WATER?S EDGE AND TOE OF
 SLOPE OF THE CANAL WHERE THE STORMWATER OUTFALL PIPE
 WILL BE LOCATED.
  
 2. IDENTIFY THE VERTICAL DATUM ON THE ENGINEERING PLANS
 AND PROVIDE THE CONVERSION EQUATION TO NGVD 1929 IF
 NGVD 1929 IS NOT THE VERTICAL DATUM. LIST BOTH ON EVERY
 SHEET WITH ELEVATION INFORMATION.
  
 3. PROVIDE THE VERTICAL DATUM CONVERSION EQUATION TO
 NGVD 1929 ON THE SURVEY.
  
 4. AUSTRALIAN AVE IS MAINTAINED BY PALM BEACH COUNTY.
 APPROVAL FROM THE COUNTY IS REQUIRED FOR ANY
 IMPROVEMENTS WITHIN AUSTRALIAN AVE RIGHT OF WAY.
  
 5. CONSIDER REDUCING THE DEPTH OF PARKING SPACES AND
 PROVIDE 2 FEET OF LANDSCAPE AREA OVERHANG.
  
 6. SHOW UTILITIES ON THE LANDSCAPE PLANS.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  