| Date |
Text |
| 2020-03-09 15:50:47 | CASE NO. PB 950XXXXX |
| | 575 S. ROSEMARY REDEVELOPMENT |
| | 575 S. ROSEMARY |
| | |
| | - CONTACT ERIC SCHNEIDER @ (561) 822-1446, |
| | [email protected] |
| | |
| | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN |
| | WRITTEN FORMAT. |
| | |
| | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR |
| | (4) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT |
| | OF ALL PLANS. |
| | |
| | 1) ZONING STAFF HAS REVIEWED THE INFORMATION SUBMITTED |
| | AS PART OF THIS APPLICATION AN NOTED THAT IT DOES NOT |
| | INCLUDE ALL OF THE INFORMATION THAT STAFF NEEDS FOR THE |
| | REVIEW AND AMENDED PLANS THAT WERE APPROVED AS PART OF |
| | RESOLUTION NO. 362-19. |
| | |
| | 2) THE FOLLOWING PLAN SHEETS SHOWING THE PROPOSED |
| | BUILDING DESIGN ARE REQUIRED: |
| | |
| | SHEET A0.01 - SITE/PROJECT DATA |
| | SHEETS A0.01.1 AND A0.01.2 - FACADE CALCULATIONS |
| | SHEET A0.04.2 - SITE PLAN |
| | SHEET A0.05 - OPEN SPACE DIAGRAMS |
| | SHEET A0.06 - ACTIVE USE DIAGRAMS |
| | SHEETS A0.07, A0.08, A0.09, A0.09.1 AND A0.10 - VARIOUS |
| | SF VERIFICATION DIAGRAMS |
| | SHEETS A1.01, A1.02, A1.03, A1.04, A1.04A, A1.05, |
| | A1.06, A1.07 AND A1.09 - FLOOR PLAN DIAGRAMS |
| | SHEETS A2.00.2, A2.01.2, A2.02.2 AND A2.03.2 - |
| | ELEVATIONS |
| | SHEETS LH-01 AND LH-02 - HARDSCAPE PLANS |
| | SHEETS LP-01, LP-02, LP-03, LP-04, LP-05 AND LP-06 |
| | |
| | 3) ALL CODE REQUIRED DATA NEEDS TO BE UPDATED - ACTIVE |
| | USE, PARKING COUNTS, PUBLIC/PRIVATE OPEN SPACE, ETC. |
| | |
| | 4) THE UNIT B1.4 BALCONY APPEARS TO ENCROACH ON THE |
| | ACCESS EASEMENT SETBACK (SHEET A1.09). |
| | |
| | 5) UPDATED OVERALL ROSEMARY SQUARE PARKING AVAILABILITY |
| | TABLE REFLECTING THE NEW, REDUCED PARKING REQUIREMENT. |
| | THIS CAN ALSO INCLUDE THE NEW SPACES DEDICATED TO THE |
| | CAR DEALER IN B GARAGE. |
| | |
| | 6) THERE IS A DISCREPANCY IN THE AMOUNT OF CHANGE |
| | BETWEEN THE EXISTING AND PROPOSED BUILDING SQUARE |
| | FOOTAGE. THE FOOTPRINT COMPARISON DONE BY LEO DALY |
| | SHOWS 3,195 LESS SQUARE FEET IN THE NEW BUILDING WHILE |
| | THE JUSTIFICATION STATEMENT SHOWS 1,620 ADDITIONAL |
| | SQUARE FEET. THE REQUIRED DRAWINGS WILL ALLOW STAFF TO |
| | SORT OUT THE DIFFERENCES AND VERIFY IF THERE IS AN |
| | INCREASE IN SQUARE FOOTAGE. NOTE: IF THERE IS AN |
| | ADDITION OF MORE THAN 1,000 SQUARE FEET, WHILE NOT |
| | TRIGGERING THE THRESHOLD OF A LEVEL III SITE PLAN |
| | REVIEW, IT TRIGGERS A LEVEL II SITE PLAN REVIEW, WHICH |
| | IS HAS A $1,500 FEE, THOUGH DUE TO THE NATURE OF THE |
| | CHANGES NO ENGINEERING FEE IS REQUIRED. THE PLANS WILL |
| | BE REVIEWED BY LANDSCAPE, BUILDING AND FIRE. PLEASE |
| | HOLD OFF ON PAYMENT UNTIL STAFF HAS DETERMINED IF THE |
| | ADDITIONAL FEE IS REQUIRED. |
| |