Plan Review Notes
Plan Review Notes For Project Z20020015
Project Number Z20020015
Review Stop ENG - PPRC
Sequence Number 4
Notes
Date Text
2021-02-18 07:23:37PASSED WITH PROVISOS:
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR, CITY OF WEST PALM BEACH PUBLIC UTILITIES,
 561-822-2262, [email protected]
  
 -DEMO PLAN SAYS WATER METER TO BE REMOVED AND REPLACED.
 SHOULD INSTEAD SAY WATER METER BOX TO BE REMOVED AND
 REPLACED. PLEASE UPDATE DURING FORMAL ENGINEERING
 SUBMITTAL.
 -NEW WATER METER BOX MUST COMPLY WITH WPB APPROVED
 MATERIAL LIST. THERE WERE TWO OPTIONS LISTED THAT NEED
 TO BE REMOVED. PLEASE CORRECT DURING FORMAL ENGINEERING
 SUBMITTAL.
  
 COMMENTS FROM RICK ROSSANO, PROJ. COORDINATOR, CITY OF
 WPB ENG. SERVICES, [email protected]:
  
 FOR ENGINEERING SUBMITTAL, INCLUDE ALL APPLICABLE
 CURRENT CITY OF WPB GENERAL NOTES AND STANDARD DETAILS.
 FOR ENGINEERING SUBMITTAL, PLEASE SHOW MIN. 6 IN.
 SANITARY CLEANOUT PER CITY STANDARD DETAIL GS-6.
 FOR ENGINEERING SUBMITTAL, PLEASE SHOW EXISTING AND
 PROPOSED PERVIOUS AND IMPERVIOUS AREAS ON PGD SHEET.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098
 MOBILE: (561) 246-9525
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved