Plan Review Notes
Plan Review Notes For Project Z20020015
Project Number Z20020015
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2020-09-11 13:58:37TRAFFIC STUDY
 1. NOTE: THE TRAFFIC STUDY PROVIDED IN THE LATEST
 SUBMISSION IS THE SAME AS THE ORIGINAL ONE. PLEASE
 PROVIDE THE UPDATED VERSION, TILL THEN PREVIOUS
 COMMENTS STAND.
 2. PLEASE REVISE THE REPORT WITH RESPECT TO THE
 MISPLACED FIGURES AND TABLES
 3. REVISE TABLE 2, SOME OF THE LANE CONFIGURATIONS ARE
 INCORRECT, FOR EXAMPLE:
 A. 25TH ST BETWEEN BROADWAY AND FLAGLER IS 2L
 B. TAMARIND AVE BETWEEN 25TH ST AND PALM BEACH LAKES
 BLVD IS 2L
 4. CORRECT TABLE 3, IT SHOULD BE PM
 5. FIGURE 4 SHOWS DRIVEWAY LEFT-TURN VOLUMES. HOWEVER,
 SITE PLAN SHOWS RIGHT-TURN ONLY
 6. PLEASE INCLUDE DAILY VOLUMES IN FIGURE 4
 7. DRIVEWAY VOLUMES WILL NEED TO BE REVISITED,
 CONSIDERING THE RIGHT-IN RIGHT-OUT CONFIGURATION
 8. THERE IS A MISMATCH WITH THE TPS LETTER REGARDING
 DEVELOPMENT INTENSITY. PLEASE REVISE AND OBTAIN AN
 UPDATED TPS LETTER
 9. PROVIDE SIGNAL TIMING SHEETS
  
  
 SITE PLAN
 10. LEFT TURN MOVEMENT FROM 25TH EASTBOUND TO DRIVEWAY
 SHALL BE FORBIDDEN
 A. 180-FOOT MEDIAN ISLAND IS REQUIRED. AUTOTURN
 ANALYSIS SHOULD BE PROVIDED FOR THIS MEDIAN DESIGN
 B. IF RAISED MEDIAN IS NOT ANTICIPATED, PROVIDE
 JUSTIFICATION THROUGH AN AUTOTURN ANALYSIS SHOWCASING
 RESTRICTIONS AND/OR ENCROACHMENT OF A LARGE WB-62FL
 GASOLINE TRUCK WITH THE REQUESTED MEDIAN
 11. MILL AND RESURFACE 25TH ST ALONG SITE FRONTAGE, AS
 NEEDED DUE TO THE RAISED MEDIAN IMPLEMENTATION
 12. THE PROPOSED IRRIGATION IS WITHIN THE CITY?S
 RIGHT-OF-WAY AND MAINTENANCE AGREEMENT WITH THE CITY IS
 REQUIRED. CONDITION: PROVIDE MAINTENANCE AGREEMENT
 PRIOR TO ISSUANCE OF A BUILDING PERMIT.
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  