| 2020-03-11 11:06:02 | TRAFFIC STUDY |
| | 1. PLEASE REVISE THE REPORT WITH RESPECT TO THE |
| | MISPLACED FIGURES AND TABLES |
| | |
| | 2. REVISE TABLE 2, SOME OF THE LANE CONFIGURATIONS ARE |
| | INCORRECT, FOR EXAMPLE: |
| | A. 25TH ST BETWEEN BROADWAY AND FLAGLER IS 2L |
| | B. TAMARIND AVE BETWEEN 25TH ST AND PALM BEACH LAKES |
| | BLVD IS 2L |
| | |
| | 3. CORRECT TABLE 3, IT SHOULD BE PM |
| | |
| | 4. FIGURE 4 SHOWS DRIVEWAY LEFT-TURN VOLUMES. HOWEVER, |
| | SITE PLAN SHOWS RIGHT-TURN ONLY |
| | |
| | 5. PLEASE INCLUDE DAILY VOLUMES IN FIGURE 4 |
| | |
| | 6. DRIVEWAY VOLUMES WILL NEED TO BE REVISITED, |
| | CONSIDERING THE RIGHT-IN RIGHT-OUT CONFIGURATION |
| | |
| | 7. THERE IS A MISMATCH WITH THE TPS LETTER REGARDING |
| | DEVELOPMENT INTENSITY. PLEASE REVISE AND OBTAIN AN |
| | UPDATED TPS LETTER |
| | |
| | 8. PROVIDE SIGNAL TIMING SHEETS |
| | |
| | |
| | SITE PLAN |
| | 9. DRIVEWAY ON 25TH ST TOO WIDE AND TOO CLOSE TO THE |
| | INTERSECTION |
| | A. REDUCE THE WIDTH AND TURNING RADIUS OR PROVIDE A |
| | JUSTIFICATION |
| | |
| | 10. LEFT TURN MOVEMENT FROM 25TH EASTBOUND TO DRIVEWAY |
| | SHALL BE FORBIDDEN |
| | A. 180-FOOT MEDIAN ISLAND IS REQUIRED. AUTOTURN |
| | ANALYSIS SHOULD BE PROVIDED FOR THIS MEDIAN DESIGN |
| | |
| | 11. GARBAGE/TRASHCAN LOCATION |
| | A. GARBAGE TRUCKS WOULD BLOCK DRIVEWAY WHEN OPERATING |
| | B. PROVIDE A BYPASS LANE |
| | |
| | 12. AUTOTURN |
| | A. FOR GARBAGE TRUCKS AND SERVICE VEHICLES |
| | B. LOADING ZONE DIMENSION AND MANEUVERABILITY |
| | |
| | 13. PROVIDE A 10-FOOT MULTIUSE PATH ON 25TH ST ALONG |
| | SITE FRONTAGE AS 25TH ST IS A DESIGNATED BIKE ROUTE PER |
| | BICYCLE MASTER PLAN |
| | |
| | 14. PROVIDE A 12-FOOT TRAIL ALONG THE CANAL PER THE |
| | BICYCLE MASTERPLAN |
| | |
| | 15. CLARIFY THE UTILITY CONNECTION LOCATIONS |
| | |
| | 16. MILL AND RESURFACE 25TH ST ALONG SITE FRONTAGE |
| | |
| | 17. THE PROPOSED IRRIGATION IS WITHIN THE CITY'S |
| | RIGHT-OF-WAY AND MAINTENANCE AGREEMENT WITH THE CITY IS |
| | REQUIRED |
| | |
| | 18. PROVIDE SITE PHOTOMETRIC ANALYSIS |
| | |
| | |
| | VALERIO ORICCHIO |
| | [email protected] |
| | 561-494-1092 |
| | |
| |