Project Number Z20020009
Review Stop STORM
Sequence Number 4
Notes
Date Text
2021-05-03 21:30:17THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 4/21/2021 AND 4/26/2021 SUBMITTALS.
  
  
 1. [SATISFIED] LANDSCAPE PLANS WERE NOT PROVIDED
 PREVIOUS COMMENT:THE ENGINEERING AND LANDSCAPE PLANS DO
 NOT MATCH THE SITE PLAN.
  
 2. [SATISFIED] ADD FLOW ARROWS TO THE ENGINEERING PLAN
 TO SHOW SURFACE WATER RUNOFF DIRECTION.
  
 3. [SATISFIED] AVOID PUTTING UTILITIES UNDER LANDSCAPE
 ISLANDS.
  
 4. [SATISFIED] TWO FOOT OVERHANG WITH 16-FOOT DEEP
 PARKING SPACES SHOWN ON WEST SIDE OT PARKING LOT.
 18-FOOT LONG SPACES SHOWN FOR PARKING SPACES ON EAST
 SIDE OF PARKING LOT. THE EAST SIDE PARKING SPACES COULD
 BE REDUCED BY TWO FEET TO TAKE ADVANTAGE OF THE TWO
 -FOOT LANDSCAPE OVERHANG. PREVIOUS COMMENT: CONSIDER
 CREATING 2 FOOT OVERHANGS INTO LANDSCAPE AREAS FOR
 PARKING SPACES. TWO-FOOT OVERHANG NO LONGER SHOWN ON
 SITE PLAN. PAVED AREA OF PARKING SPACES ARE DIMENSIONED
 AS 18' LONG.
  
 5. [SATISFIED] CATCH BASIN GRATE ELEVATIONS APPEAR TO
 BE HIGHER THAN SOME ADJACENT PARKING LOT GRADES.
  
 6. [SATISFIED] THE TRAVEL LANE SPACE BETWEEN THE
 LANDSCAPE ISLANDS ON THE ENGINEERING PLAN APPEARS TOO
 NARROW FOR TWO WAY TRAFFIC.
  
 7. [SATISFIED] PROVIDE BOTTOM ELEVATION OF EXISTING
 ONSITE DRAINAGE STRUCTURES THAT ARE TO REMAIN. [ALL
 EXISTING STRUCTURES ARE BEING REMOVED]
  
 8. [PARTIALLY SATISFIED] CHECK WITH RAY CRANCI,
 LANDSCAPE PLANNER ON WHERE ADDITIONAL CURBING MAY BE
 NEEDED FOR LANDSCAPE AREAS. PREVIOUS COMMENT: CURBING
 NEEDED FOR NARROW PARKING AREAS NORTH OF THE LANDSCAPE
 ISLANDS. [CURBING SHOWN ON THE ENGINEERING PLAN]
  
 9. [NOT SATISFIED] SHOW UTILITIES ON THE LANDSCAPE
 PLANS TO VERIFY NO CONFLICTS WITH THE PLANTING PLAN AND
 TO IDENTIFY WHERE ROOT BARRIERS MAY BE NEEDED.
 PREVIOOUS COMMENTS: LANDSCAPE PLANS NOT INCLUDED IN
 THESE SUBMITTALS. SHOW UTILITIES ON THE LANDSCAPE PLAN.
  
 10. [NOT SATISFIED] LANDSCPAE PLANS NOT PROVIDED IN
 THESE SUBMITTALS. PREVKIOUS COMMENT: SCALES SHOULD
 MATCH FOR SURVEY, ENGINEERING PLANS AND LANDSCAPE
 PLANS.
  
 11. SHEET A001 PROPOSED SITE PLAN
 A. [NOT SATISFIED] THE INCORRECT FLOOD ZONE IS NOW
 SHOWN ON SHEET A000. PREVIOUS COMMENT: UPDATE THE FLOOD
 ZONE INFORMATION (SEE THE BOUNDARY SURVEY).
 B. [SATISFIED] A STANDARD PARKING SPACE IS 8.5' X 18'.
 B.1. [NOT SATISFIED] THE STRIPING FOR PARKING SPACES
 APPEAR TO BE LONGER THAN THAN THE PARKING SPACE DEPTHS
 (16 FEET OR 18 FEET) .
 B.2. [SATISFIED] THERE IS THE OPPORTUNITY TO REDUCE THE
 AMOUNT OF ASPHALT AND PARKING LOT RECONSTRUCTION BY
 REDUCING THE LENGTH OF THE PARKING SPACES BY 2 FEET,
 INCREASING THE LANDSCAPING BY TWO FEET, REDUCE THE
 MOUNT OF STORMWATER RUNOFF AND PERHAPS REPLACING THE
 WHEEL STOPS FITH TYPE 'D' CURB. PREVIOUS COMMENT: THERE
 IS 2' PARKING OVERLAP WITH LANDSCAPING CALLED OUT FOR
 THE TEN PARKING SPACES ALONG THE BACK OF THE PARKING
 LOT. THESE PARKING SPACES ARE SHOWN TO BE 18 FEET LONG
 SO THE OVERLAP IS NOT REQUIRED.
 B.3. [NOT SATISFIED - OPTIONAL]THE DRIVE AISLE IS
 DIMENSIONED TO BE 26' 6.5" WIDE. IT CAN BE NARROWED TO
 24 FEET. CONSIDERING THIS NARROWING AND PROVIDING THE
 2' PARKING OVERLAP CAN MOVE THE EAST EDGE OF THE
 PARKING LOT TO THE WEST BY MORE THAN 4.5 FEET.
 C. [NOT SATISFIED] PROVIDE THE VERTICAL DATUM FOR THE
 FFE. IT SHOULD MATCH WHAT IS SHOWN ON THE ENGINEERING
 PLAN.
 D. [NOT SATISFIED] SHOW STOP BARS AND STOP SIGNS.
 E. [NOT SATISFIED] SHOW PARALLEL PARKING SPACES
 (STRIPING) ALONG S. DIXIE HWY.
  
 12. SHEET C-1 SITE PAVING & DRAINAGE PLAN
 A. [SATISFIED] REPLACE THE DROP CURB WITH TYPE 'F' CURB
 AND GUTTER IN FRONT OF THE BUILDING ALONG S. DIXIE HWY.
 B. [SATISFIED] REPLACE THE SIDEWALK WITH 6" THICK
 SIDEWALK WHERE THE PROPOSED DRIVEWAY IS BEING WIDENED.
 C. [SATISFIED] LABEL THE SLAB FOR THE BICYCLE RACK.
 D. [SATISFIED]LABEL THE LEFT PROPOSED WALKWAY IN FRONT
 OF THE BUILDING.
 E. [SATISFIED] CONNECT THE ROOF DRAIN(S) FOR THE
 PROPOSED BUILDING ADDITION TO THE DRAINAGE SYSTEM. (CAN
 BE SHOWN AT TIME OF ENGINEERING PERMIT).
  
 13. [SATISFIED] SHEET C-3 PGD NOTES AND DETAILS -
 INVERT ELEVATION OF PIPE SHOWN IN THE EXFILTRATION
 TRENCH DETAIL DOES NOT MATCH THE INVERT ELEVATIONS
 SHOWN ON SHEET C-1.
  
 14. [SATISFIED] SHEET EC-1 SWPPP - SHOW BMPS FOR
 OFFSITE DRAINAGE SYSTEMS.
  
 15. SHEET A002 PARKING STALL STRIPING DETAIL:
 A. [SATISFIED] WHEEL STOPS ARE GENERALLY 2 FEET FROM
 THE END OF PARKING STALL.
 B. [NOT SATISFIED] GRADES SHOWN FOR HANDICAPP PARKING
 SPACE WOULD RESULT IN A FLAT (NO SLOPE) PARKING AREA
 AND STORMWATER RUNOFF WOULD NOT DRAIN OFF. GRADES ARE
 SHOWN ON THE ENGINEERING PLAN. LABEL THE VERTICAL DATUM
 ON SHEET A002.
  
 16. [NOT SATISFIED] FDOT APPROVAL WILL BE NEEDED BEFORE
 ENGINEERING PERMIT. PREVIOUS COMMENT: S. DIXIE HWY IS
 MAINTAINED BY FDOT. FDOT'S APPROVAL FOR WORK WITHIN THE
 RIGHT OF WAY WILL BE NEEDED.
  
 17. [SATISFIED] STOP SIGNS AND STOP BARS WILL BE NEEDED
 AT THE DRIVEWAY ENTRANCES.[CAN BE PROVIDED WITH
 ENGINEERING PERMIT SUBMITTAL]
  
 18. [NOT SATISFIED] SHOW EXISTING AND PROPOSED PARKING
 ALONG S. DIXIE HWY. THE RESTRICTIVE PARKING SIGNS WILL
 NEED TO BE RELOCATED.
  
 19. NEW COMMENT] CIVIL PLANS SHOW A TYPE 'D' CURB ALONG
 THE BACK OF THE BUILDING. THE TOP OF CURB WILL BE
 ELEVATION 14.00 FEET NAVD, WHICH IS HIGHER THAN THE
 FINISHED FLOOR ELEVATION OF 13.85 FEET NAVD. SHEET A102
 SHOWS SEVERAL DOORS OPENING OUT, WHICH WILL CONFLICT
 WITH THE CURB. ONE DOOR IS SHOWN TO BE FLUSH WITH THE
 ADJACENT PAVEMENT.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]