Date Text
2020-12-31 12:44:251. PLEASE ADDRESS PRIOR COMMENTS 2 THROUGH 11.
 2. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 3. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 4. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 5. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 6. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY LABEL ROAD
 RIGHT OF WAY.
 7. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO
 PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH
 SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY
 AREAS PER CITY OF WPB STANDARD DETAIL GC-9.
 8. FOR FORMAL ENGINEERING SUBMITTAL, SHOW WATER TAP
 STRAIGHT ON TO PROPERTY FROM CITY WATER MAIN.
 9. FOR FORMAL ENGINEERING SUBMITTAL, LIST WATER, SEWER
 AND FIRE FLOW DEMANDS ON DRAWINGS.
 10. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE SHOW BOTH
 EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS AREAS ON
 PLANS.
 11. FOR FORMAL ENGINEERING SUBMITTAL, UPDATE ALL CITY
 OF WPB STANDARD DETAILS TO MOST CURRENT VERSIONS.
 12. PLEASE RESPOND TO ALL COMMENTS IN WRITING.
 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 15. PLEASE UPDATE PAVEMENT RESTORATION NOTE TO COMPLY
 WITH CITY OF WPB STANDARD DETAIL GC-8.
 16. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 17. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS. RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1098
 [email protected]
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
 PLEASE CONFIRM PRIOR COMMENTS WERE ADDRESSED:
 PROPOSED TREE INSTALLATIONS SHOULD NOT BE WITHIN 5 FEET
 OF WATER UTILITIES.
 SHEET C-1:
 -CANNOT HAVE WATER METER BOX OR BACKFLOW ASSEMBLY IN
 DRIVEWAY. METER BOX, WATER SERVICE, AND BACKFLOW
 ASSEMBLIES WOULD NEED TO BE RELOCATED, OR PLAN DESIGN
 CHANGED TO RELOCATE DRIVEWAY , IN ORDER TO ELIMINATE
 THAT CONFLICT. IF RELOCATING WATER SERVICE, METER BOX
 SHOULD NOT BE IN A SIDEWALK.
 -NEED LABEL SIZE OF EXISTING METER, WATER SERVICE, &
 BACKFLOW ASSEMBLY.
 -EXISTING & PROPOSED WATER MAINS, METER BOXES, AND
 WATER SERVICE PIPE ON PROPERTY NEEDS TO BE IN UTILITY
 EASEMENTS. NOT SURE IF EXISTING WATER MAINS NEAR SOUTH
 SIDE AND EAST SIDE ARE ALREADY IN UTILITY EASEMENTS, OR
 IF THOSE NEED TO BE GRANTED WITH THE PROJECT. PROPERTY
 OWNER SHOULD NOT BUILD WITHIN UTILITY EASEMENT. ALONG
 EAST SIDE OF PROPERTY, THERE IS SOME PARKING LOT AND
 DUMPSTER AREA STRUCTURE THAT LOOKS LIKE IT WOULD
 INTRUDE INTO UTILITY EASEMENT ? IF THEY ARE PROPOSED
 AND NOT EXISTING THEY SHOULD BE RELOCATED.
 -NOT SURE IF THERE IS A STREET OR ANOTHER PROPERTY
 ALONG SOUTH PROPERTY LINE ? CAN THAT BE ADDED?
 -PLAN SAYS ASPHALT TO BE REMOVED AROUND AREA FROM
 PROPOSED 2? METER BOX, BUT IT DOES NOT SAY THE NEW
 SURFACE. REQUEST NOTATION SAYING NEW MATERIAL. PREFER
 GRASS AROUND METER BOXES.
 -HARD TO DETERMINE SURFACE OVER 2? TAP. REQUEST LABEL
 SHOWING IF THAT IS GRASS PARKWAY OR CONCRETE SIDEWALK.
 -DID NOT SEE A DEDICATED FIRELINE SERVICE. WILL THE
 BUILDING HAVE FIRE SPRINKLERS?
 -DID NOT SEE A FIRE HYDRANT ADJACENT PROPERTY. IS A
 FIRE HYDRANT REQUIRED TO BE ADJACENT PROPERTY?
 -DID NOT SEE WATER DEMAND CHART ? NEED ADD IT.
 -RECOMMEND DUAL/PARALLEL BACKFLOW ASSEMBLIES ON
 DOMESTIC WATER SERVICE SO RESTAURANT HAS WATER DURING
 BACKFLOW MAINTENANCE OR REPAIRS.
 -IF EXISTING BACKFLOW ASSEMBLIES ARE RELOCATED, THEY
 WOULD NEED TO BE REPLACED WITH NEW LEAD-FREE COMPLIANT
 BACKFLOW ASSEMBLIES AND UNDERGO INSPECTION.
 SHEET C-4:
 -WATER SERVICE DETAILS ARE OLD ? SHOULD UPDATE TO
 NEWEST REVISION.
 NEW COMMENTS AS FOLLOWS:
 -FOR FORMAL ENGINEERING SUBMITTAL, METER BOXES ON
 PRIVATE PROPERTY NEED TO BE IN UTILITY EASEMENTS.
 SOUTHERN METER BOX MAY BE ADJUSTED SLIGHTLY SOUTH TO
 FALL WITHIN PROPOSED UTILITY EASEMENT.
 -WATER SERVICE TAP UNDER SIDEWALK WOULD LIKELY REQUIRE
 SIDEWALK REPLACEMENT.
 -DID NOT RECEIVE WRITTEN RESPONSES BACK FROM PRIOR
 COMMENTS IN MARCH2020. MAY HAVE ADDITIONAL COMMENTS
 DEPENDING ON RESPONSES.
  