| 2020-03-05 11:32:15 | 1. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. |
| | 2. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER |
| | METER AND BACKFLOW PREVENTION. |
| | 3. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES |
| | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. |
| | 4. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| | LEAD-FREE DESIGN. |
| | 5. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY LABEL ROAD |
| | RIGHT OF WAY. |
| | 6. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. |
| | 7. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO |
| | PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH |
| | SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY |
| | AREAS PER CITY OF WPB STANDARD DETAIL GC-9. |
| | 8. FOR FORMAL ENGINEERING SUBMITTAL, SHOW WATER TAP |
| | STRAIGHT ON TO PROPERTY FROM CITY WATER MAIN. |
| | 9. FOR FORMAL ENGINEERING SUBMITTAL, LIST WATER, SEWER |
| | AND FIRE FLOW DEMANDS ON DRAWINGS. |
| | 10. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE SHOW BOTH |
| | EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS AREAS ON |
| | PLANS. |
| | 11. FOR FORMAL ENGINEERING SUBMITTAL, UPDATE ALL CITY |
| | OF WPB STANDARD DETAILS TO MOST CURRENT VERSIONS. |
| | 12. PLEASE RESPOND TO ALL COMMENTS IN WRITING. |
| | |
| | FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD CUSTOMER |
| | SERVICE SUPERVISOR |
| | CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262, |
| | [email protected] |
| | |
| | -PROPOSED TREE INSTALLATIONS SHOULD NOT BE WITHIN 5 |
| | FEET OF WATER UTILITIES. |
| | |
| | SHEET C-1 |
| | -CANNOT HAVE WATER METER BOX OR BACKFLOW ASSEMBLY IN |
| | DRIVEWAY. METER BOX, WATER SERVICE, AND BACKFLOW |
| | ASSEMBLIES WOULD NEED TO BE RELOCATED, OR PLAN DESIGN |
| | CHANGED TO RELOCATE DRIVEWAY , IN ORDER TO ELIMINATE |
| | THAT CONFLICT. IF RELOCATING WATER SERVICE, METER BOX |
| | SHOULD NOT BE IN A SIDEWALK. |
| | -NEED LABEL SIZE OF EXISTING METER, WATER SERVICE, & |
| | BACKFLOW ASSEMBLY. |
| | -EXISTING & PROPOSED WATER MAINS, METER BOXES, AND |
| | WATER SERVICE PIPE ON PROPERTY NEEDS TO BE IN UTILITY |
| | EASEMENTS. NOT SURE IF EXISTING WATER MAINS NEAR SOUTH |
| | SIDE AND EAST SIDE ARE ALREADY IN UTILITY EASEMENTS, OR |
| | IF THOSE NEED TO BE GRANTED WITH THE PROJECT. PROPERTY |
| | OWNER SHOULD NOT BUILD WITHIN UTILITY EASEMENT. ALONG |
| | EAST SIDE OF PROPERTY, THERE IS SOME PARKING LOT AND |
| | DUMPSTER AREA STRUCTURE THAT LOOKS LIKE IT WOULD |
| | INTRUDE INTO UTILITY EASEMENT ? IF THEY ARE PROPOSED |
| | AND NOT EXISTING THEY SHOULD BE RELOCATED. |
| | -NOT SURE IF THERE IS A STREET OR ANOTHER PROPERTY |
| | ALONG SOUTH PROPERTY LINE ? CAN THAT BE ADDED? |
| | -PLAN SAYS ASPHALT TO BE REMOVED AROUND AREA FROM |
| | PROPOSED 2 IN. METER BOX, BUT IT DOES NOT SAY THE NEW |
| | SURFACE. REQUEST NOTATION SAYING NEW MATERIAL. PREFER |
| | GRASS AROUND METER BOXES. |
| | -HARD TO DETERMINE SURFACE OVER 2 IN. TAP. REQUEST |
| | LABEL SHOWING IF THAT IS GRASS PARKWAY OR CONCRETE |
| | SIDEWALK. |
| | -DID NOT SEE A DEDICATED FIRELINE SERVICE. WILL THE |
| | BUILDING HAVE FIRE SPRINKLERS? |
| | -DID NOT SEE A FIRE HYDRANT ADJACENT PROPERTY. IS A |
| | FIRE HYDRANT REQUIRED TO BE ADJACENT PROPERTY? |
| | -DID NOT SEE WATER DEMAND CHART ? NEED ADD IT. |
| | -RECOMMEND DUAL/PARALLEL BACKFLOW ASSEMBLIES ON |
| | DOMESTIC WATER SERVICE SO RESTAURANT HAS WATER DURING |
| | BACKFLOW MAINTENANCE OR REPAIRS. |
| | -IF EXISTING BACKFLOW ASSEMBLIES ARE RELOCATED, THEY |
| | WOULD NEED TO BE REPLACED WITH NEW LEAD-FREE COMPLIANT |
| | BACKFLOW ASSEMBLIES AND UNDERGO INSPECTION. |
| | |
| | SHEET C-4 |
| | --WATER SERVICE DETAILS ARE OLD ? SHOULD UPDATE TO |
| | NEWEST REVISION. |
| | |
| | |
| | RICK ROSSANO |
| | PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | DIRECT: (561) 494-1098 |
| | MOBILE: (561) 246-9525 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| |
Print |