Plan Review Notes
Plan Review Notes For Project Z20010042
Project Number Z20010042
Review Stop HIST
Sequence Number 1
Notes
Date Text
2020-02-12 16:22:371. ALL GLASS SHALL BE CLEAR GLASS OR CLEAR GLASS WITH
 LOW-E COATING.
 2. ALL GLASS SHALL HAVE AN EXTERNAL DIMENSIONAL PYRAMID
 MUNTIN APPLIED WITH A SPACING OF APPROXIMATELY 12
 (WIDTH) INCHES BY 18 (HEIGHT) INCHES.
 3. THE CLEMATIS STREET (NORTH) ELEVATION OF THE EASTERN
 MOST BUILDING SHALL FEATURE A STEPPED PARAPET WALL WITH
 A METAL CAST DECORATIVE MOTIF AS ASSIGNED BY STAFF.
 4. THE QUADRILLE PLACE BOULEVARD (EAST) ELEVATION OF
 THE NORTHERN BUILDING SHALL ALSO FEATURE A STEPPED
 PARAPET WALL.
 5. THE OPENED AIR CANOPY STEEL COLUMNS AND TRUSSES
 SHALL BE DESIGNED IN A MANNER SIMILAR TO HISTORIC TRAIN
 CONCOURSES/SHEDS. THE TRUSSES SHALL BE SEMI-ROUNDED
 WHILE MAINTAINING A TRIANGULAR CANOPY.
 6. THE CORNER (MAIN) ENTRY SHALL FEATURE A CENTER ARCH
 ENTRANCE FLANKED BY SMALLER ARCH ENTRIES WITH A WROUGHT
 IRON WALL OF SUBSTANTIAL HEIGHT. THE TWO SIDE ENTRIES
 SHALL BE REDESIGNED TO CREATE AN ENTRYWAY FEATURE. THE
 STEEL COLUMNS AND TRUSSES SHALL BE DESIGNED IN A MANNER
 SIMILAR TO HISTORIC TRAIN CONCOURSES/SHEDS.
 7. ALL STEEL I-BEAMS AND TRESSES SHALL HAVE A MILL OR
 BLACK FINISH.
  
 AARON BORNGRABER
 HISTORIC PRESERVATION PLANNER | DEVELOPMENT SERVICES
 PLANNING DIVISION
 [email protected] | OFFICE: 561.822.1428 | TTY:
 800.955.8771
 401 CLEMATIS STREET | P.O BOX 3147 | WEST PALM BEACH,
 FL 33402
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved