| Plan Review Notes For Project Z20010034 |
| Project Number |
Z20010034 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-02-12 09:39:44 | SITE PLAN COMMENTS: | | | 1. CONVERT THE PAVEMENT MARKING IN THE WESTBOUND EXIT | | | LANES FROM THE VALET AREA (SHEET C3.00) TO A RIGHT-TURN | | | ONLY AND THROUGH LANE SINCE THERE IS ONLY ONE RECEIVING | | | LANE IN THE PARKING LOT. | | | 2. PROVIDE TRUNCATED DOMES AT CROSSINGS ONLY ALONG THE | | | PEDESTRIAN PATH BUT NOT ALONG THE BIKE PATH. ALSO | | | PROVIDE BOLLARDS AT THE CROSSWALK ENTRANCES TO SEPARATE | | | BETWEEN PEDESTRIANS AND BICYCLES AND TO PREVENT | | | VEHICLES FROM DRIVING ON THE PED/BIKE PATH ERRONEOUSLY. | | | 3. PROVIDE CENTERLINE PAVER BAND OR USE DIFFERENT | | | PATTERNS IN THE CROSSWALKS TO SEPARATE BICYCLES AND | | | PEDESTRIANS WITHIN THE PROJECT LIMIT. WIDEN THE | | | CROSSWALKS SO THAT THE DISTANCE BETWEEN THE INNER EDGES | | | OF THE OUTSIDE CROSSWALK BANDS IS 10 FEET. | | | 4. RE-DESIGN THE CROSSWALK AND RAMP AT SAPODILLE AVENUE | | | AND WIDEN THE PEDESTRIAN REFUGE ISLAND TO ALIGN WITH | | | THE PED/BIKE PATH ON BOTH SIDES OF THE CROSSWALK. | | | 5. PROVIDE EASEMENT FOR PUBLIC ACCESS ON THE BIKE/PED | | | PATHS. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) | | | |
| |
Print |
|