| Date |
Text |
| 2020-02-10 17:33:28 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE OBTAINED FROM THE |
| | ENGINEERING SERVICES DEPARTMENT. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. DRAINAGE SYSTEM TO BE DESIGNED TO BE MEET SFWMD ERP |
| | CRITERIA FOR WATER QUALITY AND PEAK FLOW ATTENUATION. |
| | |
| | 2. DRAINAGE FLOW SHOULD MATCH EXISTING, FLOW TOWARD S. |
| | FLAGLER DRIVE. DRAINAGE SYSTEM SHOULD BE PIPED ALONG S. |
| | FLAGLER DRIVE TO THE OUTFALL TO THE SOUTH. |
| | |
| | 3. PART OF SITE FALLS WITHIN A SPECIAL FLOOD HAZARD |
| | AREA (SFHA). A MINIMUM OF 2 FEET OF FREEBOARD ABOVE THE |
| | BASE FLOOD ELEVATION IS REQUIRED FOR STRUCTURES ON |
| | PARCELS WITHIN A SFHA. |
| | |
| | 4. INDIVIDUAL LOTS SHALL NOT SURFACE DRAIN ONTO TO |
| | ADJOINING LOTS OR PROPERTIES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE OBTAINED FROM THE ENGINEERING SERVICES |
| | DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO |
| | STARTING CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |