Plan Review Notes
Plan Review Notes For Project Z20010022
Project Number Z20010022
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-02-10 17:33:28THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE OBTAINED FROM THE
 ENGINEERING SERVICES DEPARTMENT.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO BE MEET SFWMD ERP
 CRITERIA FOR WATER QUALITY AND PEAK FLOW ATTENUATION.
  
 2. DRAINAGE FLOW SHOULD MATCH EXISTING, FLOW TOWARD S.
 FLAGLER DRIVE. DRAINAGE SYSTEM SHOULD BE PIPED ALONG S.
 FLAGLER DRIVE TO THE OUTFALL TO THE SOUTH.
  
 3. PART OF SITE FALLS WITHIN A SPECIAL FLOOD HAZARD
 AREA (SFHA). A MINIMUM OF 2 FEET OF FREEBOARD ABOVE THE
 BASE FLOOD ELEVATION IS REQUIRED FOR STRUCTURES ON
 PARCELS WITHIN A SFHA.
  
 4. INDIVIDUAL LOTS SHALL NOT SURFACE DRAIN ONTO TO
 ADJOINING LOTS OR PROPERTIES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE OBTAINED FROM THE ENGINEERING SERVICES
 DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO
 STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  