2020-04-28 22:01:28THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE APRIL
 20, 2020 SUBMITTAL REVIEW PACKAGE.
  
 SHEET 2 OF 7 EROSION CONTROL SHEET
 1. MOVE GRAVEL ENTRANCE OUT OF THE RIGHT OF WAY AND
 ONTO THE SITE. THE SIDEWALK ALONG THE FRONTAGE SHOULD
 REMAIN ACCESSIBLE AT ALL TIMES EXCEPT WHEN PORTIONS ARE
 BEING REPLACED WITH 6" THICK CONCRETE AT THE PROPOSED
 DRIVEWAY CONNECTIONS.
  
 SHEET 3 OF 7 ENGINEERING PLAN
 2. INCLUDE ADDITIONAL FLOW ARROWS AT THE DRIVEWAYS WEST
 OF SIDEWALK TO SHOW RUNOFF WILL FLOW TO THE ONSITE
 CACTCH BASINS.
  
 3. ADDITONAL PROPOSED GRADES WILL BE NEEDED ON THE
 ENGINEERING PERMIT SUBMITTAL PLANS TO SHOW HOW MOST OF
 THE STORMWATER RUNOFF WILL JUST FLOW TO THE LOWEST
 CATCH BASIN IN THE NORTHEAST CORNER OF THE SITE.
  
 4. REPLACE EXISTING SIDEWALK WITH 6" THICK CONCRETE AT
 PROPOSED DRIVEWAY LOCATIONS.
  
 5. SHOW DETENTION AREA(S) (TOE OF SLOPE LINES) PROPOSED
 BEHIND THE SIDEWALK IN THE EAST AREA OF THE SITE.
  
 SHEET 4 OF 6 CROSS SECTIONS
  
 6. LABEL MINIMUM PERIMETER ELEVATION BASED ON SFWMD
 CRITERIA.
  
 7. SECTION B-B: SHOW SWALE SECTION IN 5' LANDSCAPE AREA
 TO KEEP RUNOFF FROM FLOWING DIRECTLY ONTO ADJACENT
 PROPERTY.
  
 8. SECTION D-D:
 A. SECTION SHOWS ENCROACHMENT ONTO ADJACENT PROPERTY
 INCLUDING 2' OF "BERM" AND SIDE SLOPE DOWN TO MEET
 EXISTING GRADE ON ADJACENT PROPERTY. PROVIDE AGREEMENT
 FROM ADJACENT PROPERTY OWNER FOR THIS ENCROACHMENT AND
 WHO WILL MAINTAIN IT.
  
 B. IF #8A. CANNOT BE OBTAINED, SHOW A SWALE SECTION
 SOUTH OF THE PROPERTY LINE TO KEEP RUNOFF FROM FLOWING
 DIRECTLY ONTO ADJACENT PROPERTY.
  
 C. DIMENSION THE LOCATION OF THE FENCE FROM THE
 PROPERTY LINE OR EDGE OF PAVEMENT.
  
 D. INDICATE WHERE THE FENCE ON THE NORTH PROPERTY WILL
 BE LOCATED IF #8A IS OBTAINED.
  
 E. HOW WILL THE PERIMETER LANDSCAPING OUTSIDE THE FENCE
 BE MAINTAINED?
  
 9. SECTIONS E-E AND G-G:
 A. SHOW CONCRETE DRIVEWAY APRON IN THE RIGHT OF WAY.
  
 B. REPLACE THE EXISTING SIDEWALK WITH 6" THICK
 CONCRETE.
  
 C. SHOW SWALE SECTION IN DRIVEWAY FOR DRAINAGE
 CONVEYANCE ACROSS THE DRIVEWAY. THE 2% CROSS SLOPE MAY
 NOT BE VALID.
  
 D. DIMENSION THE LOCATION OF THE PROPOSED FENCE FROM
 THE PROPERTY LINE OR EDGE OF PAVEMENT.
  
 E. MOVE THE PROPERTY LINE TO THE BACK OF SIDEWALK.
  
 SHEET 5 OF 7 DETAILS:
 10. ELIMINATE THE BLEEDER IN THE CONTROL STRUCTURE.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
 561-351-0510 (M)
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved