Date Text
2020-03-24 15:06:58THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE MARCH
 16, 2020 REVIEW SUBMITTAL PACKAGE.
  
 1. SITE PLAN AND ENGINEERING PLAN SHOW CURBING ACROSS
 THE SIDEWALK. THE SIDEWALK SHOULD NOT BE INTERRUPTED BY
 CURBING.
  
 2. PARKING AND STRIPING DETAIL ON SHEET SP-1 DIMENSIONS
 3 FEET FROM THE EDGE OF SIDEWALK TO THE BACK OF THE
 WHEEL STOP AND ALSO INCLUDES THE LABEL ?2? TO BACK OF
 WHEEL STOP, TYP.?.
  
 3. SITE PLAN ON LIGHTING PLAN DIFFERS FROM THE SITE
 PLAN ON SHEET SP-1.
  
 4. USE LEFT TURN ARROW PAVEMENT MARKING AT NORTH
 DRIVEWAY.
  
 5. PER SECTION 78-34 OF THE CITY?S MUNICIPAL CODE,
 DRIVEWAYS ARE TO BE CONSTRUCTED PER THE CITY?S PLANS
 AND SPECIFICATIONS. THE ENGINEERING SERVICES DEPARTMENT
 ONLY HAS A DRIVEWAY DETAIL FOR CONCRETE DRIVEWAYS (GC-5
 [2019]). THIS DETAIL LIMITS THE DRIVEWAY WIDTH TO 20
 FEET AT THE PROPERTY LINE. THE DRIVEWAY FLARE SHOULD BE
 DESIGNED PER FDOT PLAN 522-003 SINCE THERE IS MORE THAN
 10 FEET BETWEEN THE EDGE OF PAVEMENT AND THE SIDEWALK
 (UTILITY STRIP).
  
 6. DESIGN THE SOUTH DRIVEWAY APRON TO NOT INCLUDE THE
 EXISTING DRAINAGE STRUCTURE.
  
 7. THE PRELIMINARY ENGINEERING PLAN CALLS OUT 10 FEET
 WIDE EXFILTRATION TRENCH BUT THE EXFILTRATION DETAIL
 SHOWS 6? TRENCH WIDTH.
  
 8. CONFIRM DRAINAGE INLET TYPE C1 IS LARGE ENOUGH TO
 CONSTRUCT PRB?S ON ADJACENT OR OPPOSITE WALLS DEPENDING
 ON WHICH SIDES ARE CONNECTED TO EXFILTRATION TRENCHES.
  
 9. WATER METER IS SHOWN OUTSIDE OF THE RIGHT OF WAY.
 CONFIRM THE 10' UTILITY EASEMENT IS AVAILABLE FOR
 PUBLIC UTILITIES.
  
 10. REMOVE NOTE ?TIE IN TO EXISTING 8? PVC SEWER? SHOWN
 NEAR SOUTH DRIVEWAY. IT DOESN?T APPEAR TO BE APPLICABLE
 WITH THE CURRENT SEWER DESIGN.
  
 11. SHOW THE AREA BETWEEN BACK OF SIDEWALK AND NEW
 FENCE LINE IS TO DRAIN TO THE CONTROL STRUCTURE.
  
 12. ARCHITECTURAL ELEVATION VIEWS LIST THE FFE AS
 17.50? NAVD. THE PRELMINARY ENGINEERING PLAN LISTS THE
 FFE AS 15.50? NAVD.
  
 13. WHEEL STOPS OR CURBING IS NEEDED BETWEEN
 PARKING/VEHICULAR ACCESS AREAS AND THE LANDSCAPED
 AREAS.
  
 14. IN THE LEGEND ON THE PRELIMINARY ENGINEERING PLAN
 INCLUDE THE HATCHING PATTERN SHOWN AROUND THE MONUMENT
 SIGN AND BIKE RACKS.
  
 15. PROVIDE PRB DETAIL.
  
 16. LABEL PIPES SIZES AND MATERIAL FOR EXISTING
 UTILITIES IN THE RIGHT OF WAY.
  
 17. PROVIDE MORE HORIZONTAL DISTANCE BETWEEN THE
 PARALLEL EXFILTRATION TRENCHES SO THAT THE FUNCTION OF
 ONE DOES NOT AFFECT THE OTHER AND THE CONSTRUCTION OF
 THE SECOND TRENCH DRAIN WILL NOT AFFECT THE FIRST
 CONSTRUCTED TRENCH DRAIN.
  
 18. PROVIDE A DRAWING IDENTIFYING THE SANITARY AND
 STORMWATER STRUCTURE NUMBERS AND PIPES AS LISTED ON THE
 CCTV LOGS.
  
 19. PROVIDE COPIES OF THE CCTV VIDEOS AND PICTURES OF
 THE OBSERVATIONS LISTED ON THE CCTV REPORTS.
  
 20. REMOVE TYPE ?D? CURB IN THE RIGHT OF WAY NEXT TO
 THE NORTH DRIVEWAY APRON.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved