Plan Review Notes
Plan Review Notes For Project Z20010011
Project Number Z20010011
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-02-10 17:24:22THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE OBTAINED FROM THE
 ENGINEERING SERVICES DEPARTMENT.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. CONFIRM THE DIAMETER AND MATERIAL OF THE EXISTING
 STORM PIPES WITHIN THE RIGHT-OF-WAY.
  
 2. THE CITY USES NGVD1929 AS THE VERTICAL DATUM. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 PROVIDED THE
 CONVERSION BETWEEN NAVD1988 AND NGVD1929 IS INCLUDED.
 PROVIDE THE NAVD1988 / NGVD1929 CNVERSION EQUATION ON
 THE SURVEY.
  
 3. REMOVE THE EXISTING DRIVEWAY AND RESTORE THE SWALE.
  
 4. REPLACE SIDEWALK FLAGS WITH THE UTILITIES CROSSING
 ACROSS THE SIDEWALK..
  
 5. REPLACE SIDEWALK WITH 6" THICK CONCRETE AT THE NEW
 DRIVEWAY LOCATIONS.
  
 6. NORTH DRIVEWAY APRON AFFECTING THE EXISTING ADA
 PAD/CURBING FOR THE BUS STOP.
  
 7. PROVIDE CROSS SECTIONS FOR ALL SIDES OF THE PROPERTY
 SHOWING PERIMETER BERM AND HOW DEVELOPMENT WILL CONNECT
 TO ADJACENT PROPERTIES.
  
 8. PROPOSED DRIVEWAYS WILL AFFECT THE SWALE DRAINAGE.
  
 9. RCP PIPE TO BE USED WITHIN THE RIGHT OF WAY.
  
 10. CONSIDER USING THE EXISTING CONNECTION TO THE MS4
 OR MOVING THE CONNECTION TO THE STRUCTURE SOUTH OF THE
 NORTH DRIVEWAY. REMOVE EXISTING PIPE CONNECTION TO MS4
 IF NOT USED.
  
 11. SHOW PRBS IN ALL STRUCTURES CONNECTED TO AN
 EXILTRATION TRENCH.
  
 12. DRIVEWAY APRONS SHOULD BE SHOWN AS CONCRETE.
  
 13. SHOW UTILITIES ON THE LANDSCAPE PLANS.
  
 14. PART OF SITE FALLS WITHIN A SPECIAL FLOOD HAZARD
 AREA (SFHA). A MINIMUM OF 2 FEET OF FREEBOARD ABOVE THE
 BASE FLOOD ELEVATION IS REQUIRED FOR STRUCTURES ON
 PARCELS WITHIN A SFHA.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO
 STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  