| 2020-02-10 17:24:22 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE OBTAINED FROM THE |
| | ENGINEERING SERVICES DEPARTMENT. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. CONFIRM THE DIAMETER AND MATERIAL OF THE EXISTING |
| | STORM PIPES WITHIN THE RIGHT-OF-WAY. |
| | |
| | 2. THE CITY USES NGVD1929 AS THE VERTICAL DATUM. THE |
| | CITY HAS ALLOWED THE USE OF NAVD1988 PROVIDED THE |
| | CONVERSION BETWEEN NAVD1988 AND NGVD1929 IS INCLUDED. |
| | PROVIDE THE NAVD1988 / NGVD1929 CNVERSION EQUATION ON |
| | THE SURVEY. |
| | |
| | 3. REMOVE THE EXISTING DRIVEWAY AND RESTORE THE SWALE. |
| | |
| | 4. REPLACE SIDEWALK FLAGS WITH THE UTILITIES CROSSING |
| | ACROSS THE SIDEWALK.. |
| | |
| | 5. REPLACE SIDEWALK WITH 6" THICK CONCRETE AT THE NEW |
| | DRIVEWAY LOCATIONS. |
| | |
| | 6. NORTH DRIVEWAY APRON AFFECTING THE EXISTING ADA |
| | PAD/CURBING FOR THE BUS STOP. |
| | |
| | 7. PROVIDE CROSS SECTIONS FOR ALL SIDES OF THE PROPERTY |
| | SHOWING PERIMETER BERM AND HOW DEVELOPMENT WILL CONNECT |
| | TO ADJACENT PROPERTIES. |
| | |
| | 8. PROPOSED DRIVEWAYS WILL AFFECT THE SWALE DRAINAGE. |
| | |
| | 9. RCP PIPE TO BE USED WITHIN THE RIGHT OF WAY. |
| | |
| | 10. CONSIDER USING THE EXISTING CONNECTION TO THE MS4 |
| | OR MOVING THE CONNECTION TO THE STRUCTURE SOUTH OF THE |
| | NORTH DRIVEWAY. REMOVE EXISTING PIPE CONNECTION TO MS4 |
| | IF NOT USED. |
| | |
| | 11. SHOW PRBS IN ALL STRUCTURES CONNECTED TO AN |
| | EXILTRATION TRENCH. |
| | |
| | 12. DRIVEWAY APRONS SHOULD BE SHOWN AS CONCRETE. |
| | |
| | 13. SHOW UTILITIES ON THE LANDSCAPE PLANS. |
| | |
| | 14. PART OF SITE FALLS WITHIN A SPECIAL FLOOD HAZARD |
| | AREA (SFHA). A MINIMUM OF 2 FEET OF FREEBOARD ABOVE THE |
| | BASE FLOOD ELEVATION IS REQUIRED FOR STRUCTURES ON |
| | PARCELS WITHIN A SFHA. |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO |
| | STARTING CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |