| Plan Review Notes For Project Z20010010 |
| Project Number |
Z20010010 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-02-10 17:11:03 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE OBTAINED FROM THE | | | ENGINEERING SERVICES DEPARTMENT. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PROVIDE THE EXISTING ELEVATION FOR THE STORMWATER | | | CONTROL STRUCTURE. | | | | | | 2. CONFIRM NO ADDITIONAL WATER QUALITY TREATMENT IS | | | NEEDED FOR THE NEW IMPERVIOUS AREA. | | | | | | 3. ADD TO THE SURVEY THE NAVD1988 TO NGVD1929 VERTICAL | | | DATUM RELATIONSHIP. | | | | | | 4. PERMIT MAY BE REQUIRED FROM THE LAKE WORTH DRAINAGE | | | DISTRICT. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS | | | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE | | | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | |
| |
Print |
|