| Plan Review Notes For Project Z19120013 |
| Project Number |
Z19120013 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-02-28 15:46:42 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | FEBRUARY 11, 2020 REVIEW SUBMITTAL PACKAGE. | | | | | | 1. NO GRADING INFORMATION WAS PROVIDED, JUST FLOW | | | ARROWS. | | | | | | 2. PROVIDE A CONDITION ASSESSMENT OF THE MANHOLE TO BE | | | MODIFIED ON CONNISTON ROAD AND CONFIRM IT IS LARGE | | | ENOUGH TO ACCEPT A PIPE CONNECTION FROM THE SOUTH WITH | | | THE THREE OTHER EXISTING PIPE CONNECTIONS. | | | | | | 3. CONSIDER CONNECTING THE ONSITE DRAIINAGE SYSTEM TO | | | THE EXISTING CATCH BASIN ON S. OLIVE AVE INSTEAD OF TO | | | THE MANHOLE ON CONNISTON ROAD. THE S.OLIVE AVE INLET IS | | | DOWNSTREAM OF THE CONNISTON RD MANHOLE. | | | | | | 4. SHOW MIILL AND RESURFACE LIMITS FOR TRENCH CUR ON | | | CONNISTON ROAD. | | | | | | 5. THE CITY'S VERTICAL DATUM IS NGVD1929. THE CITY HAS | | | ALLOWED THE USE OF NAVD1988 PROVIDED THE CONVERSION | | | BETWEEN NAVD1988 AND NGVD1929 IS LISTED ON THE PLAN. | | | PROVIDE THE COVERSION EQUATION ON THE SURVEY. | | | | | | 6. LIST VERTICAL DATUM ON THE ENGINEERING PLANS AND | | | PROVIDE THE CONVERSION EQUATION TO NGVD1929. | | | | | | 7. SHOW/DIMENSION THE PARKING STALL OVERHANG, IF | | | APPLICABLE, ON THE CROSS SECTIONS ON THE ENGINEERING | | | PLANS. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
| |
Print |
|