Plan Review Notes
Plan Review Notes For Project Z19120013
Project Number Z19120013
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-01-08 11:27:45THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTPS:/
 /WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PE
 RMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE PROPOSED OUTFALL STORM PIPE TO CONNISTON ROAD IS
 SHOWN GOING NEXT TO AN EXISTING MAHOGANY TREE. WHAT
 IMPACT WILL CONSTRUCTION OF THIS PIPE HAVE ON THE TREE
 AND CAN THE IMPACT BE MITIGATED?
  
 2. NO GRADING INFORMATION WAS PROVIDED.
  
 3. MINIMIZE THE AMOUNT OF IMPERVIOUS AREA RUNOFF THAT
 WILL SHEET FLOW TOWARD THE RIGHT OF WAY AND ACROSS THE
 SIDEWALK.
  
 4. PROVIDE CROSS SECTIONS FROM THE PROPERTY LINE TO THE
 BUILDING AND TO THE PARKING AREAS. PERIMETER BERMS
 SHOULD BE PROVIDED TO CONTAIN THE STORMWATER RUNOFF.
  
 5. PROVIDE A CONDITION ASSESSMENT OF THE CATCH BASIN TO
 BE MODIFIED ON CONNISTON ROAD.
  
 6. SOUTHERN BLVD. IS MAINTAINED BY FDOT. A PERMIT WILL
 BE NEEDED FROM FDOT FOR ANY WORK WITHIN THE SOUTHERN
 BLVD RIGHT OF WAY.
  
 7. STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED TO MEET
 SFWMD CRITERIA FOR WATER QUALITY TREATMENT AND PEAK
 FLOW ATTENUATION.
  
 8. CONSIDER LOW IMPACT DEVELOPMENT (LID) BEST
 MANAGEMENT PRACTICES BESIDES EXFILTRATION TRENCHES FOR
 STORMWATER TREATMENT. CAN DEPRESSED STORMWATER
 DETENTION AREAS BE INCORPORATED IN THE LANDSCAPE GREEN
 SPACES AROUND THE BUILDING AND ALONG CONNISTON ROAD?
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO
 STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  