| Plan Review Notes For Project Z19120009 |
| Project Number |
Z19120009 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2020-07-13 17:10:52 | PASSED WITH THE FOLLOWING CONDITIONS. | | | | | | PROVIDE PROPER AUTOTURN ANALYSIS, SPECIFICALLY: | | | | | | 1) GROUND FLOOR SERVICE TRUCK: | | | A. COLORED PATH FOR VEHICLE DYNAMIC ENVELOPE AND WHEELS | | | PATHS | | | B. SEPARATE DRAWINGS FOR VEHICLE ENTERING AND DOCKING, | | | AND VEHICLE MOVING OUT OF THE DOCK AND EXITING | | | | | | 2) 2ND FLOOR PARKING: SHOWCASE A VEHICLE REACHING THE | | | DEAD-END AND MANEUVER OUT OF IT | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER, PE, PTOE | | | 561-494-1092 | | | [email protected] |
| |
Print |
|