Plan Review Notes
Plan Review Notes For Project Z19120009
Project Number Z19120009
Review Stop TRAFFIC
Sequence Number 4
Notes
Date Text
2020-07-13 17:10:52PASSED WITH THE FOLLOWING CONDITIONS.
  
 PROVIDE PROPER AUTOTURN ANALYSIS, SPECIFICALLY:
  
 1) GROUND FLOOR SERVICE TRUCK:
 A. COLORED PATH FOR VEHICLE DYNAMIC ENVELOPE AND WHEELS
 PATHS
 B. SEPARATE DRAWINGS FOR VEHICLE ENTERING AND DOCKING,
 AND VEHICLE MOVING OUT OF THE DOCK AND EXITING
  
 2) 2ND FLOOR PARKING: SHOWCASE A VEHICLE REACHING THE
 DEAD-END AND MANEUVER OUT OF IT
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER, PE, PTOE
 561-494-1092
 [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved