| Date |
Text |
| 2020-06-19 17:58:40 | UPDATED ON 6/22/2020 |
| | |
| | TRAFFIC STUDY COMMENTS: |
| | 1. THE HCS ANALYSES SHOWCASE LEVEL OF SERVICE ?F? FOR |
| | THE BANYAN/TAMARIND INTERSECTION AND SIGNIFICANT QUEUE |
| | LENGTHS IN THE EB AND WB, FOR THE AM AND PM PERIOD, |
| | RESPECTIVELY. DUE TO SUCH CONDITIONS AT BUILDOUT YEAR, |
| | SIGNIFICANT MITIGATION MEASURES ARE REQUIRED. |
| | 2. PROVIDE THE FOLLOWING TRANSPORTATION DEMAND |
| | MANAGEMENT (TDM) MEASURES, INCLUSIVE OF DETAILED |
| | IMPLEMENTATION PLANS, AND PROVIDE YEARLY STATISTICS OF |
| | TDM UTILIZATION SUMMARY TO THE CITY TO ENCOURAGE |
| | MULTI-MODAL TRANSPORTATION, SPECIFICALLY: |
| | A. REDUCE THE PROPOSED NUMBER OF PARKING SPACES ? |
| | LATEST RESUBMITTAL ONLY SHOWS A REDUCTION OF 2 PARKING |
| | SPACES (FROM 81 TO 79). FURTHER REDUCTION IS REQUIRED |
| | OR JUSTIFICATION FOR THE PROPOSED HIGH NUMBER OF EXTRA |
| | SPACES |
| | B. PROPOSE AND PROVIDE TRANSIT SUBSIDIES TO RESIDENTS - |
| | PLEASE PROVIDE A STATEMENT OR ACKNOWLEDGMENT |
| | |
| | SITE PLAN COMMENTS: |
| | 3. PER THE TRAFFIC STUDY, THE TRAFFIC CONDITIONS NEAR |
| | THE SITE ARE EXPECTED TO SIGNIFICANTLY IMPACT VEHICULAR |
| | ACCESS. THE WESTBOUND QUEUE AT BANYAN/TAMARIND IS |
| | EXPECTED TO BE OVER 2,000 FEET DURING WEEKDAY PM PEAK |
| | HOUR. INBOUND AND OUTBOUND LEFT-TURNING VEHICLES COULD |
| | RESULT IN POTENTIAL SAFETY CONCERN TO ROAD USERS. A |
| | MEDIAN ISLAND IS BEING CONSIDERED AS PART OF THE BANYAN |
| | BOULEVARD IMPROVEMENT. |
| | A. PLEASE COORDINATE WITH THE WGI TEAM WORKING ON |
| | BANYAN BLVD IMPROVEMENTS AND INCORPORATE THEIR MEDIAN |
| | ISLAND DESIGN IN THE SITE PLAN |
| | 4. THE DEVELOPMENT IS PROPOSING 79 PARKING SPACES, |
| | WHICH IS 37 SPACES OVER THE MINIMUM REQUIREMENT OF 42. |
| | PROVIDING EXCESS PARKING SPACES IS LIKELY TO INDUCE |
| | EXTRA VEHICULAR TRIPS. IT IS RECOMMENDED THAT A |
| | FLEXIBLE PARKING ARRANGEMENT BE MADE, SPECIFICALLY: THE |
| | 2ND FLOOR COULD BE CONVERTED TO ANOTHER USE IN THE |
| | FUTURE, WHILE IN THE MEANTIME THE 1ST FLOOR COULD BE |
| | LEASED OUT AS PUBLIC PARKING FOR TRI-RAIL PASSENGERS, |
| | WITH REVENUE SHARING WITH THE CITY TO SUPPORT THE |
| | CITY?S TRANSIT OPERATION FUND. MOREOVER, AS THIS IS A |
| | TAX CREDIT AFFORDABLE HOUSING AND ALSO A MICRO UNIT |
| | PROJECT, THE AMOUNT OF VEHICLE USE WILL BE MUCH LOWER |
| | THAN A TYPICAL RESIDENTIAL PROJECT. PLEASE PROVIDE |
| | DETAILED JUSTIFICATION TO THE EXCESSIVE NUMBER OF |
| | PARKING SPACES. |
| | 5. PROVIDE PATHS FOR TRUCKS EXITING THE LOADING ZONE |
| | ONTO BANYAN BOULEVARD ? TRUCK AUTOTURN ANALYSIS FOR THE |
| | LOADING ZONE IN THE ARCHITECTURAL PLANS SHOWCASES |
| | VEHICLE EXITING INTO BANYAN BLVD IN A BACKWARD FASHION. |
| | PLEASE CLARIFY AND/OR REVISE. |
| | 6. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF |
| | PUBLICLY ACCESSIBLE SIDEWALK AND PATHWAYS WITHIN THE |
| | PROPERTY RIGHT-OF-WAY. |
| | 7. PROVIDE AUTOTURN ANALYSIS FOR THE TANDEM PARKING |
| | SPACES ON THE 2ND FLOOR NEARBY THE RAMP |
| | |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER, PE, PTOE |
| | 561-494-1092 |
| | [email protected] |
| |