2020-06-16 14:13:46FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 301 BANYAN Z19120009
 JUNE 16, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE
 DISPOSITION PLAN:
 ? SATISFIED. TREES AND PALMS CANOPY SQUARE FOOTAGE TO
 BE MITIGATED BASED ON CATEGORY. MANGO AND SEA GRAPE ARE
 CATEGORY 1.
 CANOPY DIAMETER MAY CHANGE SOME SQUARE FOOTAGE.
 ? SATISFIED. ANY TREES 20 FEET OR MORE CANOPY DIAMETER
 TO BE MITIGATED BY ACTUAL SQUARE FOOTAGE. CANOPY
 DIAMETER MUST BE PROVIDED FOR EACH TREE AND
 CALCULATIONS ARE ROUNDED UP TO THE NEXT FULL SQUARE
 FOOT.
 PROVIDE CANOPY DIAMETER FOR EACH TREE. CHANGE THE
 CANOPY (SQ-FT) COLUMN TO CANOPY DIAMETER. THIS NEEDS TO
 BE SHOWN TO DETERMINE CALCULATION OF MITIGATION SQUARE
 FOOTAGE BY CATEGORY OR ACTUAL SQUARE FOOTAGE. PALMS DO
 NOT NEED CANOPY DIAMETER, ONLY CATEGORY.
 ? SATISFIED. PROVIDE THE TOTAL SQUARE FOOTAGE OF
 MITIGATION FOR ALL TREES AND PALMS PROPOSED TO BE
 REMOVED.
 ADJUST ALL MITIGATION FOR THE ABOVE COMMENTS AND
 PROVIDE NEW TOTAL.
 ? SATISFIED. PROVIDE THE MITIGATION VALUES BY CATEGORY
 FOR THE PROPOSED TREES AND PALMS BASED ON CATEGORY AND
 PROVIDE THE TOTAL MITIGATION SQUARE FOOTAGE. THEN
 PROVIDE ANY OVERAGE OR DEFICIENCY SQUARE FOOTAGE.
 AFTER MITIGATION SQUARE FOOTAGE DUE IS RECALCULATED,
 UPDATE AND PROVIDE ONE TOTAL FOR DEFICIENCY, THEN
 CALCULATE PAYMENT IN LIEU.
 2. SATISFIED. STAFF REQUESTS THAT A NARRATIVE BE ADDED
 THAT EXPLAINS THE REASON THE EXISTING BLACK OLIVE TREES
 IN THE RIGHT OF WAY CANNOT BE RETAINED. THERE IS A
 ZONING REVIEW COMMENT REGARDING THE SETBACK OF THE
 BUILDING THAT MAY POSITIVELY AFFECT THE TREES. ALSO
 EXPLAIN THE PROGRESSION OF THE BANYAN STREETSCAPE
 PROJECT DESIGN THAT WAS INTENDED TO PRESERVE THE
 EXISTING CANOPY TREES, AND WHAT THE REPLACEMENT TREE
 CANOPY WILL BE.
 BLACK OLIVE TREES WERE ORIGINALLY TO REMAIN IN PLACE
 FOR THE BANYAN STREETSCAPE PROJECT. DEVELOPMENT OF THE
 SITE AT THE CURRENT BUILDING SETBACK IS THE CAUSE TO
 REMOVE THE TREES AND REDESIGN THE BANYAN STREETSCAPE
 PROJECT TO ADJUST FOR THE BUILDING DEVELOPMENT. THE
 BUILDING SETBACK IS CURRENTLY BEING DISCUSSED AS PART
 OF THE ZONING REVIEW AND MAY CHANGE. PLEASE PROVIDE THE
 CORRECT NARRATIVE.
  
 3. SATISFIED. SHOW STREETSCAPE REQUIRED FOR TAMARIND
 AVE. ADJACENT TO THE PROPERTY. PER SECTION 94-113.
  
 4. SATISFIED. QBD-3 ZONING WITH LOT SIZE LESS THAN
 50,000 SQ FT REQUIRES 25% PRIVATE OPEN SPACE. SURVEY
 INDICATES 33279.7 SQ FT, 25% EQUALS 8319.925 SQ FT.
 ROUND TO 8320 SQ FT REQUIRED.
 PRIVATE OPEN SPACE AREAS SHOWN ON SHEET A-1.07 MUST BE
 BROKEN DOWN TO SHOW THE REQUIRED VEGETATED AREA AND ANY
 TREE CANOPY REQUIREMENT FOR EACH AREA AS THE ALLOWED
 OPEN SPACE TYPE PER TABLE IV-6, AND DEFINITIONS FOUND
 IN 94-109. TERRACE REQUIRES 20% MINIMUM VEGETATED AREA.
 ROOFTOP GARDEN REQUIRES 30% VEGETATED AREA AND 20% TREE
 CANOPY. TREE CANOPY VALUES CAN BE FOUND IN SECTION
 94-109 TABLE IV-8. THIS INFORMATION MUST BE REFLECTED
 ON THE LANDSCAPE PLAN.
 SHEET LP-1.02 NEEDS TO SHOW THE OPEN SPACE AREA
 MATCHING SHEET A-1.07 AND BE LABELED AS ROOFTOP GARDEN
 TO MATCH THE LANDSCAPE REQUIREMENTS CHART IF THE
 CALCULATIONS ARE CORRECT. TERRACE IS A SEPARATE PRIVATE
 OPEN SPACE TYPE THAT MAY BE USED, BUT THE PLAN AND THE
 CHART MUST BE CONSISTENT.
  
 5. SATISFIED. SHOW LOCATIONS OF UTILITY LINES ON
 LANDSCAPE PLAN, ALSO LOCATIONS OF VALVES AND BACKFLOW
 PREVENTERS AND FPL TRANSFORMERS.
  
 6. SATISFIED. SHOW LOCATIONS OF ANY ROOT BARRIERS
 REQUIRED TO PROTECT UTILITY LINES.
  
 7. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L.
 PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT
 MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES.
  
 PROVIDE THE ACTUAL PERCENTAGE CALCULATED FROM THE PLANT
 LIST FOR THE PROJECT. SEPARATE THE OFFSITE PARCEL.
  
 ADDITIONAL COMMENTS 4/22/20:
  
 8. SATISFIED. PROVIDE SEPARATE COLUMNS ON THE PLANT
 LIST FOR NATIVE AND DROUGHT TOLERANT CLASSIFICATIONS.
  
 9. SATISFIED. PROJECTS MUST BE SEPARATED FOR ALL
 LANDSCAPE REQUIREMENTS AND CALCULATIONS. THIS WOULD
 MEAN ALL FLORIDA FRIENDLY POINTS, ETC. MUST BE ON A
 SEPARATE SHEET FOR THE LANDSCAPING THAT IS FOR THE
 SEPARATE NORTH PARCEL.
  
 10. SATISFIED. EAST BUFFER HAS WIDE GAPS IN THE
 LANDSCAPING, A CONTINUOUS HEDGE NEEDS TO BE PROVIDED.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 STREET TREES AND RIGHT OF WAY LANDSCAPING AND
 IRRIGATION APPROVED WITH THIS PETITION.
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A
 SEPARATE MAINTENANCE AGREEMENT WITH THE CITY.
  
  