| Date |
Text |
| 2020-04-28 09:12:09 | TRAFFIC STUDY COMMENTS: |
| | 1. PROVIDE QUEUEING ANALYSIS FOR THE GATED ENTRY. |
| | 2. THE HCS ANALYSES SHOWCASE LEVEL OF SERVICE "F" FOR |
| | THE BANYAN/TAMARIND INTERSECTION AND SIGNIFICANT QUEUE |
| | LENGTHS IN THE EB AND WB, FOR THE AM AND PM PERIOD, |
| | RESPECTIVELY. DUE TO SUCH CONDITIONS AT BUILDOUT YEAR, |
| | SIGNIFICANT MITIGATION MEASURES ARE REQUIRED. |
| | 3. PROVIDE THE FOLLOWING TRANSPORTATION DEMAND |
| | MANAGEMENT (TDM) MEASURES, INCLUSIVE OF DETAILED |
| | IMPLEMENTATION PLANS, AND PROVIDE YEARLY STATISTICS OF |
| | TDM UTILIZATION SUMMARY TO THE CITY TO ENCOURAGE |
| | MULTI-MODAL TRANSPORTATION, SPECIFICALLY: |
| | A. UNBUNDLE PARKING SPACES FROM THE RESIDENTIAL LEASE |
| | B. REDUCE THE PROPOSED NUMBER OF PARKING SPACES |
| | C. PROPOSE AND PROVIDE TRANSIT SUBSIDIES TO RESIDENTS |
| | D. PROVIDE MICROMOBILITY STATION ACCESSIBLE BY THE |
| | PUBLIC |
| | E. CONTRIBUTE FUNDING TOWARDS THE CITY'S TRANSIT |
| | OPERATIONS FUND |
| | |
| | |
| | SITE PLAN COMMENTS: |
| | 4. PER THE TRAFFIC STUDY, THE TRAFFIC CONDITIONS NEAR |
| | THE SITE ARE EXPECTED TO SIGNIFICANTLY IMPACT VEHICULAR |
| | ACCESS. THE WESTBOUND QUEUE AT BANYAN/TAMARIND IS |
| | EXPECTED TO BE OVER 2,000 FEET DURING WEEKDAY PM PEAK |
| | HOUR. INBOUND AND OUTBOUND LEFT-TURNING VEHICLES COULD |
| | RESULT IN POTENTIAL SAFETY CONCERN TO ROAD USERS. A |
| | MEDIAN ISLAND IS BEING CONSIDERED AS PART OF THE BANYAN |
| | BOULEVARD IMPROVEMENT. |
| | 5. PROVIDE ADDITIONAL BIKE RACKS NEAR THE CORNER OF |
| | TAMARIND/BANYAN. |
| | 6. A TURNAROUND SPACE AND BACK UP AREA AT THE DEAD-END |
| | AISLE IS REQUIRED ON THE FIRST AND SECOND FLOOR PARKING |
| | GARAGE. PER CITY CODE, A MINIMUM THREE-FOOT BACK UP |
| | AREA SHALL BE PROVIDED AT THE TERMINUS OF ANY DEAD-END |
| | DRIVE AISLE TO ALLOW FOR VEHICLES TO SAFELY PULL OUT OF |
| | THE END PARKING SPACES. IN ADDITION, THE EQUIVALENT OF |
| | ONE PARKING SPACE AT THE TERMINUS OF A DEAD-END AISLE |
| | SHALL BE STRIPED AS A DEDICATED PULL-IN AREA FOR |
| | TURNING AROUND. |
| | 7. PROVIDE AUTOTURN FOR THE DEAD-END TURNAROUND AREA |
| | AND THE SET OF TANDEM SPACES ON THE SECOND FLOOR OF THE |
| | GARAGE WITHIN THE RAMP LOOP. |
| | 8. THE DEVELOPMENT IS PROPOSING 81 PARKING SPACES, |
| | WHICH IS 43 SPACES OVER THE MINIMUM REQUIREMENT OF 38. |
| | THAT IS A 113% SURPLUS. PROVIDING EXCESS PARKING SPACES |
| | IS LIKELY TO INDUCE EXTRA VEHICULAR TRIPS. IT IS |
| | RECOMMENDED THAT A FLEXIBLE PARKING ARRANGEMENT BE |
| | MADE, SPECIFICALLY: THE 2ND FLOOR COULD BE CONVERTED TO |
| | ANOTHER USE IN THE FUTURE, WHILE IN THE MEANTIME THE |
| | 1ST FLOOR COULD BE LEASED OUT AS PUBLIC PARKING FOR |
| | TRI-RAIL PASSENGERS, WITH REVENUE SHARING WITH THE CITY |
| | TO SUPPORT THE CITY'S TRANSIT OPERATION FUND. MOREOVER, |
| | AS THIS IS A TAX CREDIT AFFORDABLE HOUSING AND ALSO A |
| | MICRO UNIT PROJECT, THE AMOUNT OF VEHICLE USE WILL BE |
| | MUCH LOWER THAN A TYPICAL RESIDENTIAL PROJECT. PLEASE |
| | PROVIDE DETAILED JUSTIFICATION TO THE EXCESSIVE NUMBER |
| | OF PARKING SPACES. |
| | 9. PROVIDE PATHS FOR TRUCKS EXITING THE LOADING ZONE |
| | ONTO BANYAN BOULEVARD. |
| | 10. PROVIDE SIDEWALK EASEMENT FOR THE PORTION OF |
| | PUBLICLY ACCESSIBLE SIDEWALK AND PATHWAYS WITHIN THE |
| | PROPERTY RIGHT-OF-WAY. |
| | 11. PROVIDE PHOTOMETRIC ANALYSIS. |
| | 12. CLARIFY GARBAGE PICK-UP OPERATIONS. |
| | 13. PROVIDE LOCATION OF THE EXISTING PALM TRAN SHELTER |
| | ON THE SITE PLAN |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | TUESDAYS TO THURSDAYS) |
| |
Print |