| 2020-04-15 15:54:28 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | 4/10/2020 SUBMITTAL PACKAGE. |
| | |
| | 1. THIS REVIEW DOES NOT INCLUDE THE PROPOSED |
| | IMPROVEMENTS ON THE CRA PROPERTY. PROVIDE A SEPARATE |
| | SET OF PLANS. |
| | |
| | 2. PROVDE A MAP LABELING THE PIPES AND STRUCTURE |
| | NUMBERS USED IN THE CCTV VIDEOS/REPORTS. |
| | |
| | 3. THE DRAINAGE SYSTEM ON THE EAST SIDE OF THE PROPERTY |
| | IS PROPOSING TO CONNECT TO AN INLET THAT IS BEING |
| | INSTALLED AS PART OF THE BANYAN BLVD IMPROVEMENT |
| | PROJECT. IF THIS PROJECT DOES NOT PROCEED, YOU WILL |
| | NEED TO REVISE WHERE THE DRAINAGE SYSTEM WILL CONNECT |
| | TO THE MS4, WHICH MAY REQUIRE INSTALLING A MANHOLE |
| | DIRECTLY SOUTH ON THE STORM MAIN. CHANGE THE MANHOLE IN |
| | THE RIGHT OF WAY WITHIN THE BIKE LANE ON THE SOUTHEAST |
| | SIDE OF THE BUILDING TO A CATCH BASIN INLET TO BE |
| | LOCATED COMPLETELY OUTSIDE THE BIKE LAKE. ANY REASON |
| | WHY THIS CATCH BASIN INLET CANNOT CONNECT TO THE ONSITE |
| | MANHOLE INSTEAD OF THE ONSITE CATCH BASIN? |
| | |
| | 4R. PROVIDE CROSS SECTIONS FOR ALL FOR SIDES OF THE |
| | BUILDING EXTENDING FROM THE FACE OF THE BUILDING TO |
| | ROADWAY CENTERLINES AND PROPERTY LINES. THERE SHOULD |
| | NOT BE FLOW ONTO ADJACENT PROPERTIES. |
| | |
| | 5. ON THE SITE PLAN, SHEET SP-1, PROPERLY SHOW THE |
| | ALLEY AND 20 FT ROW NORTH OF THE SITE AS PRIVATE |
| | PARCELS. |
| | |
| | 6. MOVE THE FH IN THE SOUTHWEST CORNER OF THE SITE INTO |
| | THE RIGHT-OF-WAY. |
| | |
| | TRACY WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | [email protected] |
| | 561-494-1120 |
| |
Print |