| 2020-01-07 16:39:06 | 1. AREA ALL OF THE UNITS AFFORDABLE OR ARE SOME MARKET |
| | RATE? IF SOME ARE MARKET RATE, THE TOTAL INCENTIVE |
| | PERMITTED FOR AFFORDABLE HOUSING AND MARKET RATE IS |
| | CALCULATED USING THE CITY?S MOST RECENT VERSION OF THE |
| | PURCHASE AFFORDABILITY TABLE AS ADMINISTERED BY THE |
| | HOUSING AND COMMUNITY DEVELOPMENT DEPARTMENT PER |
| | SECTION 94-134. |
| | 2. THE PROPOSED PROJECT DOES NOT UTILIZE THE CRA |
| | PROPERTY, BUT IS DIRECTLY ADJACENT TO THE LAND THAT |
| | CONNECTS TO THE NORTHWEST NEIGHBORHOOD. THE CRA IS |
| | WILLING TO INCENTIVIZE THIS PROJECT AS IT IS AN |
| | IMPORTANT PROPERTY FOR ENTERING INTO THE NORTHWEST |
| | NEIGHBORHOOD. STAFF WOULD LIKE TO CONTINUE CONVERSATION |
| | WITH THE CRA AND THE DEVELOPER TO APPROPRIATELY CONNECT |
| | THIS PROPERTY TO THE NEIGHBORHOOD. |
| | 3. PLEASE EXPLAIN WHY THE EXISTING BLACK OLIVE TREES |
| | CANNOT BE PRESERVED. THE PRESERVATION OF THESE TREES |
| | WAS INTENDED THROUGH THE BANYAN BOULEVARD STREETSCAPE |
| | IMPROVEMENTS. |
| | 4. ZONING ATLAS IV ILLUSTRATES AN EXTENSION OF DOUGLAS |
| | AVENUE TO BE A ?NEW SECONDARY ROAD?. THIS IS FURTHER |
| | REFERENCED: |
| | A. SECTION 94-119 (A): ADDITIONALLY, THIS DISTRICT |
| | SHALL CREATE A STRONG CONNECTION WITH THE NORTHWEST |
| | NEIGHBORHOOD BY EXTENDING THE STREET GRID FROM BANYAN |
| | BOULEVARD TO 2 ND STREET.? |
| | B. SECTION 94-119(E): PROPOSED DEVELOPMENTS UTILIZING |
| | ANY INCENTIVE PROGRAM SHALL ACCOMMODATE THE EXTENSION |
| | OF DIVISION AND DOUGLAS AVENUES NORTH OF BANYAN |
| | BOULEVARD PURSUANT TO SECTION 94-133 TO ENHANCE |
| | CONNECTIVITY TO THE NORTHWEST NEIGHBORHOOD. |
| | THIS REQUIREMENT WILL NEED TO BE FURTHER ANALYZED AS |
| | THE PROPOSED DESIGN OF THE PEDESTRIAN CONNECTIVITY DOES |
| | NOT SATISFY THE INTENT OF THIS SECTION. |
| | 5. THE PROPOSED PEDESTRIAN CONNECTION DOES NOT PROVIDE |
| | SATISFACTORY CONNECTIVITY TO THE NEIGHBORHOOD. HOW WILL |
| | THIS AREA BE IMPROVED? THIS AREA IS ADJACENT TO BLANK |
| | WALL AND MECHANICAL ROOM AND DOES NOT PROVIDE ANY |
| | PUBLIC BENEFIT FOR ITS USERS. TREE GRATES DOES NOT |
| | EFFECTIVELY ENHANCE THE AREA. |
| | 6. ACTIVE USES ARE REQUIRED ALONG THE SIDE INTERIOR LOT |
| | LINE (30%), AS ZONING ATLAS IV ILLUSTRATES A ?NEW |
| | SECONDARY ROAD? EXTENSION OF DOUGLASS AVENUE. |
| | 7. PLEASE ILLUSTRATE THE USE OF THE HATCHED AREA UNDER |
| | THE PARKING GARAGE AT THE BUILDING?S NORTHEAST CORNER |
| | (ADJACENT TO PROPOSED PEDESTRIAN CONNECTION). |
| | 8. THERE ARE ACTIVE USE REQUIREMENTS FOR GROUND FLOOR |
| | AND ACTIVE USE LINER REQUIREMENTS FOR THE SECOND FLOOR. |
| | TAMARIND AVENUE IS A PRIMARY PEDESTRIAN STREET AND |
| | REQUIRES 65% ACTIVE USE ALONG THE GROUND FLOOR AND 60% |
| | ACTIVE USE LINER FOR FLOOR 2 (ALONG PARKING GARAGE |
| | USE). SEE DEFINITIONS OF ACTIVE USE AND ACTIVE USE |
| | LINER IN SECTION 94-109. |
| | 9. THE REQUIRED ACTIVE USE LINER DEPTH FOR RESIDENTIAL |
| | USE IS 15? FOR FLOOR 2. PLEASE COMPLY WITH ACTIVE USE |
| | LINER REQUIREMENT AND UPDATE REQUIREMENTS IN SITE DATA |
| | TABLE ON SHEET A-1.03 TO REFLECT CORRECT REQUIREMENT. |
| | THIS INCLUDES BANYAN BOULEVARD, TAMARIND AVENUE AND THE |
| | SIDE INTERIOR LOT LINE (NEW SECONDARY STREET). |
| | 10. PLEASE ENSURE THAT THE LATEST BANYAN BOULEVARD |
| | STREETSCAPE DESIGN IS INCORPORATED INTO THE SITE PLAN |
| | AS THE REVIEW PROGRESSES. |
| | 11. PLEASE INCLUDE THE STREET CENTERLINES ON THE SITE |
| | PLAN. |
| | 12. ALL SETBACKS SHALL BE MEASURED FROM THE EXISTING |
| | CURB LINE. PLEASE INDICATE EXISTING CURB LINE AND |
| | PROPOSED CURB LINE CLEARLY ON ALL PLANS. THE BUILDING |
| | APPEARS TO EXCEED THE MAXIMUM SETBACK OF 30? ALONG |
| | TAMARIND AVENUE ON THE GROUND FLOOR AND THE TOWER. |
| | 13. PLEASE INCLUDE THE SETBACK DIMENSION TO THE UPPER |
| | FLOORS ON THE SITE PLAN SHEET SP-1. |
| | 14. PLEASE INCLUDE A MIN. EIGHT FOOT CLEAR SIDEWALK |
| | ALONG TAMARIND AVENUE. ALL STREETSCAPE REQUIREMENTS OF |
| | SECTION 94-113 (D) SHALL BE INCORPORATED ALONG TAMARIND |
| | AVENUE. |
| | 15. PLEASE INCLUDE A PROPOSED HARDSCAPE PLAN. |
| | 16. IN ORDER TO ACCOMMODATE THE BACK OF HOUSE UTILITIES |
| | AND ROOMS ALONG THE REAR PROPERTY LINE, PLEASE EVALUATE |
| | OPTIONS TO REORIENT THE PARKING GARAGE. WORKING WITH |
| | THE CITY?S TRAFFIC ENGINEER, PLEASE EVALUATE LOCATING |
| | THE ENTRANCE INTO THE PARKING GARAGE FROM BANYAN |
| | BOULEVARD (AT THE EAST SIDE OF THE PROPERTY) RATHER |
| | THAN ON TAMARIND AVENUE, AS THE ENTRANCE IS VERY CLOSE |
| | TO THE INTERSECTION OF BANYAN BOULEVARD AND TAMARIND |
| | AVENUE. THIS WILL ALSO PERMIT ACTIVE USES OR APPEARANCE |
| | OF ACTIVE USES ALONG THE BANYAN BOULEVARD FA?ADE RATHER |
| | THAN A LARGE EXPANSE OF NON-ACTIVE USE WITH LARGE |
| | ROLLING DOORS. |
| | 17. CONSIDER THE ROLLING OF DUMPSTERS TO THE BANYAN |
| | BOULEVARD CURB THROUGH THE IMPROVED PEDESTRIAN WALKWAY |
| | AREA, WITH A DUMPSTER HOLDING AREA ALONG THE FRONTAGE |
| | OF BANYAN BOULEVARD. NEED TO INCLUDE PUBLIC WORKS |
| | DEPARTMENT IN DISCUSSION. THIS WILL ELIMINATE NEED FOR |
| | LARGE ROLLING DOOR WHICH NEGATIVELY IMPACTS THE |
| | BUILDING FA?ADE ALONG BANYAN BLVD. |
| | 18. THE ARCHITECTURE DOES NOT MEET THE INTENT OR |
| | REQUIREMENTS WITHIN THE DOWNTOWN MASTER PLAN ZONING OR |
| | THE INTENT OF THE COMPREHENSIVE PLAN FOR ARCHITECTURAL |
| | COMPATIBILITY AND DESIGN. ON FACADES ENCLOSING ACTIVE |
| | USES (SEE SEC. 94-109 FOR DEFINITION OF ACTIVE USE), |
| | FENESTRATION SHALL COVER A MINIMUM OF 15% OF THE FA?ADE |
| | AREA ? THIS DOES NOT INCLUDE PAINTED OR FAUX |
| | FENESTRATION. ON FACADES ENCLOSING NON-ACTIVE USES, |
| | ARCHITECTURAL TREATMENT SHALL BE PROVIDED (SEE SECTION |
| | 94-109 FOR DEFINITION OF ARCH. TREATMENT). SEE TABLE |
| | IV-4: FA?ADE ARTICULATION REQUIREMENTS AT THE END OF |
| | SECTION 94-109 FOR MORE DETAIL. |
| | 19. THE PROPOSED ARCHITECTURE IS NOT COMPATIBLE OR |
| | APPROPRIATE FOR THIS LOCATION, WHICH SERVES AS AN |
| | IMPORTANT ENTRANCE INTO THE CITY FROM AUSTRALIAN |
| | AVENUE, AS WELL AS A KEY ENTRANCE INTO THE HISTORIC |
| | NORTHWEST NEIGHBORHOOD. PLEASE EVALUATE THE SURROUNDING |
| | AREAS AND ARCHITECTURE FOR AN ARCHITECTURAL DESIGN THAT |
| | IS APPROPRIATE FOR THIS AREA. |
| | 20. PER SECTION 94-119(E), MAIN BUILDING ENTRANCES TO |
| | LOBBIES AND COMMON AREAS SHALL HAVE A HIGH QUALITY |
| | DESIGN ENTRANCE CANOPY |
| | 21. PLEASE INCLUDE STREET VIEW 3D RENDERINGS. |
| | 22. PLEASE ILLUSTRATE COMPLIANCE WITH THE REQUIRED |
| | BUILDING FOOTPRINT FOR LEVELS 2-8, WHICH CANNOT EXCEED |
| | 90% PER FLOOR. PLEASE SEE DEFINITION OF FOOTPRINT IN |
| | SECTION 94-109 WHICH EXCLUDES SOME AREAS INCLUDING |
| | ROOFTOP DECKS, AND POOLS, ETC. |
| | 23. THE FAR IS CALCULATED BASED ON GROSS BUILDING AREA |
| | AND DOES NOT INCLUDE MECHANICAL ROOMS, TRASH ROOMS, |
| | ETC. PER DEFINITION OF GROSS BUILDING AREA IN SECTION |
| | 94-109. PLEASE REVISE SHEET A-1.01 AND SITE PLAN DATA |
| | TO REFLECT. |
| | 24. PLEASE SEPARATE BASE FAR PERMITTED AND FAR |
| | PERMITTED WITH INCENTIVE. PLEASE INDICATE TOTAL SF |
| | PERMITTED BY RIGHT AND SEPARATELY, THE SF PERMITTED |
| | WITH THE INCENTIVE. PLEASE INCLUDE TOTAL SF PROPOSED |
| | FOR INCENTIVE. |
| | 25. THERE IS A DISCREPANCY BETWEEN GROSS SF LISTED ON |
| | SHEET A-1.01 AND SHEET SP-1. PLEASE CLARIFY. |
| | 26. SHEET A 1.06 LISTS GROSS AREA; HOWEVER THE CITY?S |
| | DEFINITION OF GROSS AREA EXCLUDES MECHANICAL ROOMS, |
| | TRASH ROOMS, ETC. PLEASE RELABEL TO AVOID CONFUSION |
| | WITH SHEET A-1.01. |
| | 27. PLEASE INCLUDE PERMITTED HEIGHT BY RIGHT AND |
| | PERMITTED INCENTIVE HEIGHT IN DATA TABLE. |
| | 28. THE PROPOSED RECESSED STAIRWELL ALONG BANYAN |
| | BOULEVARD DOES NOT MEET THE INTENT OF A PLANAR BREAK |
| | PER THE DEFINITION. A PLANAR BREAK SHOULD RESULT IN AN |
| | OPEN SPACE OR EXTENSION OF THE PUBLIC SIDEWALK AT THE |
| | GROUND LEVEL. |
| | 29. FA?ADE H DOES NOT MEET THE DEFINITION OF PLANAR |
| | BREAK AT THE GROUND LEVEL. PLANAR BREAKS ARE REQUIRED |
| | AT BOTH GROUND LEVEL AND TOWER LEVEL. |
| | 30. PARKING SPACES SHALL BE DOUBLE STRIPED MEETING |
| | REQUIREMENTS OF SECTION 94-485. |
| | 31. TANDEM PARKING SPACES CAN ONLY COUNT AS TWO SPACES |
| | IF THE SPACES ARE DEDICATED TO THE SAME RESIDENTIAL |
| | UNIT, AND A RESTRICTIVE COVENANT SHALL BE RECORDED ON |
| | CITY APPROVED FORMS, AND RECORDED IN THE PUBLIC |
| | RECORDS. (SECTION 94-111(E)). THE SITE DATA CURRENTLY |
| | LISTS THE RESIDENTIAL PARKING AT 1 PER UNIT. |
| | 32. IF THE PARKING SPACES ARE NOT RESERVED, PARKING |
| | SPACES ADJACENT TO A WALL OR OTHER PHYSICAL BARRIER |
| | SHALL HAVE AN INCREASED WIDTH OF ONE FOOT. WITH |
| | OBSTRUCTION ON BOTH SIDES OF THE STALL, THE STALL |
| | WIDTHS SHALL BE INCREASED BY A MINIMUM OF TWO FEET. |
| | 33. AN EQUIVALENT OF ONE PARKING SPACE SHALL BE |
| | PROVIDED AND STRIPED AT THE TERMINUS OF DEAD-END DRIVE |
| | AISLES FOR A TURN-AROUND SPACE. |
| | 34. THE AREA IN FRONT OF THE ENTRANCE TO THE TENANT |
| | STORAGE AREA IN THE PARKING GARAGE SERVES ALSO AS A |
| | BACKUP AREA FOR VEHICLES IN THE END PARKING SPACE, |
| | WHICH IS A DANGEROUS SITUATION. PLEASE ADDRESS FOR SAFE |
| | ACCESS. |
| | 35. PLEASE PROVIDE FIVE RESERVED SPACES FOR CAR SHARING |
| | STATION PARKING. ONCE PROJECT IS FINALIZED, STAFF CAN |
| | DETERMINE HOW MANY SPACES NEED TO BE OCCUPIED BY CAR |
| | SHARING AND HOW MANY CAN BE RESERVED FOR FUTURE CAR |
| | SHARE. |
| | 36. MICROUNIT PROJECTS ARE REQUIRED TO PROVIDE A BIKE |
| | SHARING STATION ON SITE. THIS CAN BE RESERVED FOR A |
| | MICROMOBILITY SHARING STATION AS THE CITY IS GOING |
| | THROUGH THE PROCESS OF CONTRACTING A REPLACEMENT FOR |
| | SKYBIKE. |
| | 37. PLEASE NOTE, A PROJECT WITH RESIDENTIAL MICRO-UNITS |
| | SHALL CONTRIBUTE A TROLLEY FEE PER UNIT PER MONTH TO |
| | SUPPORT THE OPERATION OF THE CITY?S TROLLEY SYSTEM, AS |
| | ESTABLISHED BY RESOLUTION. |
| | 38. IN ADDITION TO MICRO-UNIT AND STANDARD UNIT BICYCLE |
| | RACKS, THE PROJECT IS REQUIRED TO INCLUDE BICYCLE RACKS |
| | FOR PUBLIC USE AT A RATE OF 1 PER 100 FEET OF STREET |
| | FRONTAGE. THESE PUBLIC BICYCLE RACKS CAN BE LOCATED AT |
| | THE PROJECT?S ENTRANCE. |
| | 39. THE BICYCLE RACKS FOR MICRO AND STANDARD UNITS MUST |
| | ALL BE CONTAINED WITHIN THE BUILDING, UNDER COVER AND |
| | SECURE. |
| | 40. HOW WILL THE PARKING GARAGE BE SECURED? HOW WILL |
| | THE PARKING SPACES FOR THE RETAIL USE BE ACCESSIBLE? |
| | PLEASE RESERVE THE PARKING SPACES THAT ARE LISTED FOR |
| | RETAIL USE. |
| | 41. ALL ABOVE GROUND UTILITIES SHALL BE UNDERGROUNDED. |
| | 42. PLEASE INDICATE THE PROPOSED LOCATION OF THE |
| | EXISTING TRAFFIC SIGNAL POLE. |
| | 43. PLEASE NOTE, ANY ROOF MOUNTED MECHANICAL EQUIPMENT |
| | SHALL BE SCREENED TO THE HEIGHT OF THE EQUIPMENT. |
| | 44. PLEASE MAKE NOTE ON PLANS THAT ANY WALL MOUNTED |
| | UTILITIES SHALL BE PAINTED TO MATCH BUILDING FA?ADE |
| | AND/OR EFFICIENTLY SCREENED FROM THE PUBLIC VIEW. |
| | 45. UNDERSTANDING THE LOCATION MAY CHANGE AS THE |
| | PROCESS CONTINUES, PLEASE INDICATE PROPOSED LOCATION OF |
| | BACKFLOW PREVENTER ON PLANS. ALL GROUND MOUNTED |
| | UTILITIES SHALL BE SCREENED BY LANDSCAPING TO THE |
| | FULLEST EXTENT POSSIBLE. PLEASE INCLUDE ON LANDSCAPE |
| | PLANS. |
| | 46. PLEASE EVALUATE UTILIZING WALL MOUNTED FDC. |
| | 47. PLEASE INCLUDE THE FPL TRANSFORMER INSIDE THE |
| | BUILDING. |
| | 48. PLEASE NOTE, ALL PARKING STRUCTURE ENTRANCES SHALL |
| | BE REQUIRED TO TREAT THE INTERIOR PORTION OF THE GARAGE |
| | TO A DEPTH OF AT LEAST 20 FEET, INCLUDING FLOORS WALLS |
| | AND CEILINGS. ALL MECHANICAL, ELECTRICAL, AND PLUMBING |
| | SYSTEMS SHALL BE COVERED OR SCREENED. TREATMENT MAY |
| | INCLUDE, BUT SHALL NOT BE LIMITED TO, STUCCO OR |
| | PLASTER, FINISHED AND PAINTED COMPARABLE TO A HABITABLE |
| | SPACE. PLEASE MAKE NOTE ON PLANS TO MEET REQUIREMENT. |
| | 49. PLEASE INCLUDE PHOTOMETRIC PLANS AND LOCATION OF |
| | PROPOSED LIGHT POLES ON THE ROW. |
| | 50. PLEASE REMOVE REFERENCE TO ANY SIGNAGE OR ADD A |
| | NOTE ?SIGNAGE TO BE REVIEWED UNDER SEPARATE PERMIT? |
| | 51. PLEASE NOTE, A MAINTENANCE AGREEMENT SHALL BE |
| | REQUIRED FOR THE PROJECT PER SECTION 94-113(7). |
| | 52. FOR THE AFFORDABLE HOUSING INCENTIVE PROGRAM, PER |
| | SECTION 94-134, THE PROPOSED DEVELOPMENT SHALL OBTAIN |
| | CITY COMMISSION AUTHORIZATION FOR THE CONVEYANCE OF |
| | CITY-OWNED DEVELOPMENT RIGHTS AS A REQUIREMENT OF SITE |
| | PLAN APPROVAL. PLEASE NOTE, IF THE SITE PLAN APPROVAL |
| | EXPIRES PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE |
| | DEVELOPMENT RIGHTS TRANSFERRED BY THE CITY AT NO COST |
| | ARE FORFEITED AND REVERT BACK TO THE CITY. |
| | 53. PLEASE NOTE, ALL DEVELOPMENTS SEEKING TO UTILIZE |
| | THE AFFORDABLE HOUSING INCENTIVE SHALL ENTER INTO ENTER |
| | INTO AN AFFORDABLE HOUSING DEVELOPMENT AGREEMENT WITH |
| | THE CITY, ON CITY APPROVED FORMS WHICH INCLUDE THE |
| | CONDITIONS LISTED IN SECTION 94-134(F). |
| | 54. PLEASE INCLUDE CIVIL PLANS FOR ALL SETS WITH |
| | RESUBMITTALS. |
| | |
| | LIZ LEVESQUE, URBAN DESIGN PLANNER |
| | [email protected] |
| | 561 822 1426 |
| |
Print |