2020-01-07 07:29:10SHOW ADDRESS ON PLANS
 PROVIDE WATER AND SEWER DEMANDS ON PLANS. WILL EXISTING
 METERS BE SUFFICIENT? WILL SANITARY NEED TO BE UPSIZED
 DOWNSTREAM?
 PROVIDE CCTV OF SEWER AND STORM ALONG PROJECT FRONTAGE
 CONFIRM/VERIFY SANITARY FLOW DIRECTION
 SHOW MATERIALS, PIPE SIZES ETC.
 SHOW CONFLICTS AND PROFILES AT PROPOSED UTILITY
 CROSSINGS.
 SHOW FM IN RAILROAD ROW
 FOR ENGINEERING SUBMITTAL, SHOW ENLARGED DETAIL OF
 PROPOSED METER LOCATION WITH EASEMENT FOR METER
 PLACEMENT.
  
 FOLLOWING COMMENTS FROM MARK HURLEY, PUBLIC UTILITIES
 CUSTOMER SERVICE SUPERVISOR, [email protected],
 561-822-2262:
 -THE PLAN LOOKS TO BE TAKING INTO ACCOUNT THE
 FORTHCOMING BANYAN STREETSCAPE PROJECT, BUT NEEDS TO BE
 PREPARED IF CHANGES OCCUR. FOR INSTANCE, THE EXISTING
 WATER SERVICES AND METER BOXES ON BANYAN MAY POSSIBLY
 BE ELIMINATED (BOTH OF THEM). IF THE ONE TO THE
 SOUTHWEST IS NOT ELIMINATED AND GOING TO USE 2 IN.
 METER, WOULD LIKE IT BROUGHT OUT OF SIDEWALK AND INTO
 SMALL GRASS U.E. NOT SURE IF PLAN ACCOUNTED FOR
 EXISTING SERVICE TO FAR SOUTHEAST.
 -THERE MAY BE A FORTHCOMING TAMARIND UTILITY PROJECT
 THAT HAS BEEN IN PLANNING FOR LONG TIME. PLAN MAY NEED
 ADJUSTMENT IF THAT TAKES PLACE BEFOREHAND.
 -DOMESTIC METER SIZE NEEDS TO BE DETERMINED AS METERS
 ABOVE 2 IN. REQUIRE MUCH MORE SPACE AND NEED TO BE
 ABOVE-GROUND AND OUT OF TRAFFIC.
 -WATER MAIN MATERIAL NOT SHOWN ON LABEL. SERVICE SIZE
 AND METER SIZE ALSO NOT SHOWN AND LABELED.
 -DOMESTIC BACKFLOW ASSEMBLY NOT SHOWN. RECOMMEND
 PARALLEL DOMESTIC BACKFLOW ASSEMBLIES SO CUSTOMER IS
 NOT WITHOUT WATER DURING MAINTENANCE. THEY CANNOT BE
 LOCATED INSIDE BUILDING, IN SIDEWALK, OR IN ROW.
 -ADD WS SD # TO LABEL IF CONSTRUCTING SOMETHING THAT
 WOULD REFERENCE IT SUCH AS A FIRELINE BACKFLOW
 ASSEMBLY. PUT COPY OF THAT WATER SERVICE STANDARD
 DETAIL IN PLAN.
 -NEED LABEL CONFLICT CROSSING OF FIRELINE WITH FM & S.
 PREFER WATER LINES ABOVE SEWER LINES WHEN POSSIBLE.
 -SIZE OF WET TAP NOT LABELED ALONG WITH SIZE OF
 FIRELINE AND SIZE OF DCDA. TYPE OF MATERIAL IS ALSO NOT
 ON LABEL. NEED POINT OF SERVICE VALVE AT PROPERTY LINE
 ? LIKE IT TO BE OUT OF HEAVY TRAFFIC WHEN POSSIBLE.
 -20 IN. WATER MAIN MATERIAL NOT LABELED.
 -THE WESTERN DRIVEWAY IS BEING BUILT OVER LARGE SEWER
 PIPES (FM & S) WHICH COULD BE PROBLEMATIC IF
 MAINTENANCE WERE NEEDED WHERE DRIVEWAY HAD TO BE SHUT
 DOWN AND DRIVEWAY EXCAVATED. CAN GARAGE PARKING STILL
 BE FUNCTIONALLY USED IN THAT EVENT?
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING
 ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 FAX: (561) 494-1116 MOBILE: (561) 246-9525
 EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved