| Date |
Text |
| 2020-01-07 07:20:04 | PROVIDE WATER AND SEWER DEMANDS ON PLANS. WILL EXISTING |
| | METERS BE SUFFICIENT? |
| | SHOW MATERIALS, PIPE SIZES ETC. |
| | SHOW CONFLICTS AND PROFILES AT PROPOSED UTILITY |
| | CROSSINGS. |
| | LABEL LIFT STATION. |
| | |
| | COMMENTS FROM MARK HURLEY, PUBLIC UTILITIES CUSTOMER |
| | SERVICE SUPERVISOR, [email protected], 561-822-2262: |
| | -NO DEMAND CHART ? NEED ADD CHART SHOWING WATER DEMAND. |
| | -CITY WATER MAIN RUNNING ALONG THE WHOLE LENGTH OF |
| | SOUTH SIDE OF PROPERTY LINE IS NOT CORRECTLY LABELED |
| | WITH SIZE AND MATERIAL TYPE. IF IT IS NOT ALREADY IN |
| | UTILITY EASEMENT AND ON PRIVATE PROPERTY, THEN UTILITY |
| | EASEMENT NEED BE SETUP. SAME WITH EXISTING 3? INCH |
| | METER AT SW CORNER OF PROPERTY ? (THAT ONE HAS 4 IN. |
| | PARALLEL BACKFLOW PREVENTERS AND THOSE NEED BE LABELED |
| | AS WELL) |
| | -PLAN IS HARD TO UNDERSTAND ? IS THE INTENTION TO HAVE |
| | FIRE LOOPED SYSTEM WITH NEW 8 IN. DCDA BACKFLOW |
| | ASSEMBLY AND TAP ON SE AREA OF PROPERTY NEAR DUMPSTERS? |
| | -PLAN IS HARD TO UNDERSTAND ? IS THE INTENTION TO HAVE |
| | DOMESTIC LOOPED SYSTEM WITH NEW 4 IN. RP BACKFLOW |
| | ASSEMBLY AND TAP ON SE AREA OF PROPERTY NEAR DUMPSTERS? |
| | IF YES, IT WOULD NEED A METER AS WELL. IF IT IS GOING |
| | TO BE 3 IN. TO MATCH SW CORNER, THEN THIS WOULD NEED TO |
| | BE AN ABOVE GROUND INSTALL. PROPERTY WOULD HAVE TO |
| | PROVIDE CLEAR ACCESS FOR METER READING AND MAINTENANCE. |
| | THERE ARE ALSO MANY EXISTING LARGE TREES IN THAT AREA |
| | WITH ROOTS THAT MAY BE PROBLEMATIC AND NEED RELOCATION |
| | AND ROOT BARRIERS. |
| | -RECOMMEND ADDING SEVERAL EXTRA GATE VALVES ON THE RUNS |
| | OF PRIVATE FIRE MAINS AND WATER MAINS IN THE PROPERTY. |
| | OTHER COMMUNITIES HAVE RECENTLY BEEN HAVING TROUBLE |
| | LOCATING LEAKS AND THAT COULD HELP. |
| | -IS THE LIFT STATION AT SE CORNER OF PROPERTY OWNED BY |
| | THE PROPERTY AND BEING FED BY ITS WATER LINES? |
| | -IF REFERENCING ANY CITY WATER SERVICE STANDARD |
| | DETAILS, THEN THOSE SHOULD BE ADDED TO PLAN AND |
| | REFERENCED. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES |
| | DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR WPB, FL 33401 (MAILING |
| | ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 |
| | FAX: (561) 494-1116 MOBILE: (561) 246-9525 |
| | EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING |
| | |
| |