2021-04-05 21:41:41THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 3/22/2021 SUBMITTAL PACKAGE.
  
 1. [PARTIALLY SATISFIED] EXPLAIN WHY THE PROPOSED CURB
 LINE AT THE NORTHEAST CORNER OF 2ND STREET AND
 SAPODILLA AVE IS BEING MOVED INTO THE ROAD AND
 NARROWING THE LANE WIDTH. PREVIOUS COMMENT:PROPOSED
 NORTH CURB DOES NOT ALIGN WITH THE EXISTING CURB AT THE
 WEST END OF 2ND STREET. THERE IS ALSO A GAP BETWEEN THE
 START OF THE CURB AND THE BEGINNING OF THE WESTERN
 PARALLEL PARKING AREA.
  
 2. [PARTIALLY SATISFIED] MOVE STRUCTURE S-105 WEST OR
 EAST SO THAT IT IS NOT DIRECTLY SOUTH OF THE MID-BLOCK
 CROSS WALK.PREVIOUS COMMENT: AVOID PLACEMENT OF
 MANHOLES AND OTHER STRUCTURES WITHIN THE SIDEWALK. IF
 UNAVOIDABLE, LOCATE THE STRUCTURES AWAY FROM CROSS
 WALKS WHERE POSSIBLE.
  
 3. [SATISFIED] DRAINAGE AND SANITARY SEWER PIPES AND
 STRUCTURES TO BE LOCATED A MINIMUM DISTANCE OF 3 FEET
 (5 FEET PREFERRED) FROM WATER MAINS.
  
 4. [NOT SATISFIED] SHOW 10' WIDE EASEMENT CENTERED OVER
 THE STORM PIPE. PREVIOUS COMMENT: EASEMENT WILL NEED TO
 BE PROVIDED TO THE CITY FOR THE STORM PIPE BETWEEN
 S-204 AND THE EXISTING CATCH BASIN IF THE DESIGN DOES
 NOT CHANGE.
  
 5. [NOT SATISFIED] WHAT IS THE PURPOSE OF STRUCTURE
 S-201, A TYPE 'D' DBI IN THE PARKWAY OF 3RD STREET?
  
 6. [SATISFIED] WILL CONSTRUCTION EASEMENTS BE NEEDED TO
 INSTALL THE DRAINAGE SYSTEM ALONG THE WEST PROPERTY
 BOUNDARY?
  
 7. [NOT SATISFIED] COMMENT CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL. VERIFY THE HGL BETWEEN
 STRUCTURE CS-1 AND S-101 WILL NOT EXCEED THE RIM
 ELEVATION OF S-101.
  
 8. [SATISFIED] HOW WHERE THE CROSS SECTIONS PROVIDED ON
 SHEET C3.1 ARE TAKEN. LABEL THE PARTICULAR STREET RIGHT
 OF WAY ON EACH SECTION.
  
 9. [NOT SATISFIED] COMMENT CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL. ASSUMING SECTION A IS FOR
 THE WEST PROPERTY LINE NORTH OF THE ALLEY, DIMENSION
 THE HORIZONTAL DISTANCE BETWEEN THE PROPERTY LINE AND
 THE CENTER OF THE 18" STORM PIPE.
  
 10. [NOT SATISFIED] COMMENT CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL. ASSUMING SECTION B IS FOR
 THE WEST PROPERTY LINE SOUTH OF THE ALLEY,DIMENSION THE
 HORIZONTAL DISTANCE BETWEEN THE PROPERTY LINE AND THE
 CENTER OF THE 18" STORM PIPE.
  
 11. [NOT SATISFIED] ASSUMING SECTION C IS FOR 2ND
 STREET (30' R/W), CREATE A DEPRESSION BETWEEN THE BACK
 OF CURB AND FRONT OF WALK TO CAPTURE THE STORMWATER
 RUNOFF FORM THE SIDEWALK. SHOW WHERE THE EXISTING C&G
 ON THE NORTH SIDE IS LOCATED IN RELATION TO THE NORTH
 R/W LINE.
  
 12. [NOT SATISFIED] PROVIDE A SECTION OF 2ND STREET
 WHERE THERE WILL NOT BE PARKING ON THE NORTH SIDE OF
 THE STREET.
  
 13. [NOT SATISFIED] CAN EXTERIOR SIDEWALK OUTSIDE THE
 LEASING LOBBY BE LOWERED, AN ELEVATED LANDING BE
 CREATED OUTSIDE THE DOORS TO THE LEASING LOBBY AND
 STEPS AND HANDICAP RAMP BE CREATED TO CONNECT THE
 EXTERIOR SIDEWALK TO THE LANDING? PREVIOUS COMMENT:
 ASSUMING SECTION D IS FOR ROSEMARY AVE, CAN THE FFE OF
 22.0 FT NAVD FOR THE LEASING LOBBY AT THE SE CORNER OF
 THE DEVELOPMENT BE LOWERED TO REDUCE THE SIDEWALK
 ELEVATION OF 21.85 FT AND THEREBY FLATTEN THE SLOPE
 BETWEEN THE SIDEWALK AND BACK OF CURB? AS CURRENTLY
 DESIGNED, THIS SLOPE IS AROUND 4:1. THE FFE OF THE REST
 OF THE DEVELOPMENT ALONG ROSEMARY AVE. IS 20.6 FT NAVD.
  
 14. [NOT SATISFIED] CONSIDER USING PERVIOUS PAVERS TO
 REDUCE THE AMOUNT OF STORMWATER RUNOFF.
  
 15. [NOT SATISFIED] ON THE DRAINAGE PLAN, THE VIEWPORT
 SCALE DOES NOT MATCH THE SHEET SCALE. THE DIMENSIONED
 LINES APPEAR TO BE 10% SHORTER USING THE SHEET SCALE.
  
 16. [NOT SATISFIED] ASSUMING SECTION E IS FOR 3RD ST.,
 THE SECTION SHOWS THE R/W AS 25 FEET WIDE AND THE
 SURVEY HAS THE RIGHT OF WAY AT 50 FEET WIDE.
  
 17. [NOT SATISFIED] THE GAP BETWEEN THE LANDSCAPE
 ISLAND AND C&G IS NOT SHOWN. PREVIOUS COMMENT: HOW WILL
 RUNOFF FLOWING INTO THE 3 PARKING SPACES DIRECTLY EAST
 OF THE MIDBLOCK CROSSWALK ON 3RD ST AND INTO THE
 PARKLING SPACES ON 2ND STREET REACH A DRAINAGE
 STRUCTURE?
  
 18. [NOT SATISFIED] ON SECTION E FOR 3RD STREET, THE
 8.0 FEET PARKING SPACE DIMENSION WOULD EXTEND FROM THE
 EDGE OF TRAVEL LANE TO THE FACE OF THE 'D' CURB AND
 WOULD INCLUDE THE 2-FOOT VALLEY GUTTER AND 6 FEET OF
 ASPHALT. THE BACK OF 'D' CURB WOULD BE 3.3 FEET FROM
 THE R/W LINE AND THE LANDSCAPE AREA BETWEEN THE
 SIDEWALK AND 'D' CURB WOULD BE 6.3 FEET WIDE INSTEAD OF
 5 FEET. PREVIOUS COMMENT: ON 3RD STREET, CONSIDER
 SLOPING THE PROPOSED PARKING TOWARD THE STREET AND
 INSTALL VALLEY GUTTER WHERE THE EXISTING TYPE 'F' C&G
 IS LOCATED. TYPE 'D' CURB CAN THEN BE INSTALLED AT THE
 HIGH SIDE OF THE PARKIG SPACE AND DRAINAGE STRUCTURES
 S-201 AND S-203 MAY NOT BE NEEDED.
  
 19. [NOT SATISFIED] PROVIDE SMALL RETENTION AREAS
 BEHIND THE NORTH SIDEWALK OF 2ND STREET BETWEEN STOOPS
 TO REDUCE THE AREA DIRECLTY DRAINING TO THE R/W.
  
 20. [PARTIALLY SATISFIED] PROPOSED GRADES WILL BE
 NEEDED FOR THE DRIVEWAY. THE PROPOSED TRENCH DRAIN AND
 CONNECTION TO THE ONSITE DRAINAGE SYSTEM SHOULD NOT
 ALLOW BYPASS OF THE PERIMETER ELEVATION FOR THE SITE.
 PREVIOUS COMMENT: INDICATE HOW THE PROPOSED DRIVEWAY TO
 SAPODILLA AVE WILL DRAIN.
  
 21. [PARTIALLY SATISFIED] ADA MATS MAY BE NEEDED ON
 EITHER SIDE OF THIS DRIVEWAY AND ON EACH SIDE OF THE
 ENDTRANCE TO THE PARKING GARAGE. PREVIOUS COMMENT: WILL
 CURB RAMPS BE NEEDED ON EITHER SIDE OF THIS DRIVEWAY?
  
 22. PROFILE VIEWS OF ALL PROPOSED STORM PIPES WITHIN
 THE RIGHT OF WAY WILL NEED TO BE PROVIDED WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 NEW COMMENTS:
 23. STOP SIGN AND STOP BAR SHOULD BE BEHIND THE
 SIDEWALK FOR THE MIDBLOCK DRIVEWAY TO SAPODILLA AVE.
  
 24. PROPOSED EAST CURB LINE OF SAPODILLA AVE NEAR 3RD
 STREET WILL CREATE TOO NARROW OF A STREET FOR TRAFFIC.
  
 25. CHECK INVERT ELEVATIONS AND SLOPES OF PROPOSED
 SANITARY SEWERS.
  
 26. PIPE SIZES LISTED WITH SEWER INVERTS DO NOT MATCH
 THE PIPE SIZES CALLED OUT FOR THE EXISTING SEWERS ON
 ROSEMARY AVE.
  
 27. CAN THE SPOT GRADES OF 24.50 FEET NAVD AT 5 FEET
 FROM THE SOUTH PROPERTY LINE BE LOWERED TO 24.0 FEET?
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved