| Plan Review Notes For Project Z19110010 |
| Project Number |
Z19110010 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2020-11-05 06:55:48 | COMMENTS FROM RICK ROSSANO, PROJ. COORD., CITY OF WPB | | | ENG. SERVICES, [email protected], 561-494-1098: | | | | | | FOR ENGINEERING SUBMITTAL: | | | CALL OUT PIPE MATERIAL AND SIZE FOR PROPOSED WATER TAP. | | | SHOW PROFILE OF ALL UTILITY CROSSINGS. | | | CONFIRM ALL FRANCHISE UTILITIES ARE SHOWN. | | | MOVE BLOW-UP DETAIL CIRCLE OVER PROPOSED | | | BACKFLOWS/METERS. | | | MOVE METERS OUTSIDE OF SIDEWALK. | | | | | | COMMENTS FROM MARK HURLEY OF PUBLIC UTILITIES CUSTOMER | | | SERVICE AT 561-822-2262 OR [email protected]. | | | -PROPERTY IS PROPOSED TO HAVE MULTIPLE AREAS WITH | | | VARYING WATER USAGE SUCH AS MULTIFAMILY, RETAIL, AND | | | OFFICES. WITH THE WAY THE METERED WATER SERVICES ARE | | | PROPOSED TO BE SETUP, UTILITY BILLING/USAGE WILL BE FOR | | | WHOLE PROPERTY AND NOT CALCULATE THE INDIVIDUAL | | | PORTIONS SEPARATELY. WANTED TO MAKE SURE THAT WAS | | | CONSIDERED BEFORE WATER SERVICES ARE BUILT OUT. | | | | | | |
| |
Print |
|