| Date |
Text |
| 2020-07-31 06:09:50 | THE FOLLOWING COMMENTS ARE FROM THE SUBMITTAL PROVIDED |
| | FOR THE JULY 9, 2020 PPRC MEETING AND MUST BE ADDRESSED |
| | PRIOR TO SITE PLAN APPROVAL: |
| | |
| | 1. [NOT SATISFIED] PAGE 17 OF THE DECLARATION OF |
| | CONVENANTS (ORB5430, PAGE 1548) STATES THERE IS TO BE A |
| | 20' BUFFER ADJACENT TO LAKES AND NO PARKING IS |
| | PERMITTED IN THE BUFFER. PROVIDE A COPY OF THE AMENDED |
| | CONVENANT. |
| | |
| | 1.1 [NEW COMMENT] SHOW THE 20' BUFFER PER THE |
| | DECLARATION OF COVENANTS ALONG THE PROPOSED LAKE |
| | EXPANSION. |
| | |
| | 1.2 [NEW COMMENT] PART OF THE CORNERS OF THE BUILDING |
| | AND BALCONIES APPEAR TO ENCROACH IN THE 20' CANAL |
| | BUFFER. |
| | |
| | |
| | 1.3 [NEW COMMENT] SECTION 8 OF THE DECLARATION OF |
| | COVENANTS STATES PARKING WILL NOT BE PERMITTED ON |
| | PUBLIC ROADWAYS. |
| | |
| | 2. [NOT SATISFIED] UPDATE THE REFERENCE TO THE FEMA |
| | FIRM LISTED ON THE SURVEY. NEW FLOOD MAPS WERE ISSUED |
| | IN 2017. |
| | |
| | 3. [SATISFIED] CONSIDER RELOCATING THE WATER AND FIRE |
| | SERVICE LINES FROM UNDER LANDSCAPE ISLANDS TO AVOID |
| | CONFLICTS WITH THE PROPOSED LANDSCAPING. |
| | |
| | 4. [NO LONGER APPLICABLE] PROVIDE CROSS SECTIONS IN |
| | EACH DIRECTION OF THE DETENTION AREA SHOWING THE GRAVEL |
| | PATHWAY. |
| | |
| | 5. [SATISFIED] THE STORM ALIGNMENT ON THE LANDSCAPE |
| | PLANS DOESN'T APPEAR TO MATCH THE ALIGNMENT OF ON THE |
| | ENGINEERING PLANS. |
| | |
| | 6. [NEW COMMENT] CONFIRM THE LENGTH OF RETAINING WALL |
| | ALL ALONG THE LAKE DOES NOT EXCEED 40 PERCENT OF THE |
| | SHORELINE LENGTH PER SFWMD WET RETENTION/DETENTION AREA |
| | DIMENSIONAL CRITERIA. THE SHORELINE IS MEASURED AT THE |
| | CONTROL ELEVATION. |
| | |
| | 7. [NEW COMMENT] THE FOLLOWING APPEAR TO BE PROPOSED TO |
| | BE CONSTRUCTED ON LAND NOT OWNED BY THE APPLICANT. |
| | CONSTRUCTION EASEMENTS AND MAINTENANCE AGREEMENTS MAY |
| | BE NECESSARY. |
| | A. LAKE EXPANSION AND RETAINING WALL |
| | B. PAVER ENTRANCE |
| | C. WATER MAINS, WATER METER AND BACKFLOW ASSEMBLIES |
| | D. STORMWATER AND SANITARY SEWER STRUCTURES |
| | E. PARKING LOT MODIFICATIONS |
| | |
| | 8. [NEW COMMENT] PROVIDE CCTV OF THE STORM SEWER AS |
| | SHOWN ON MAP PROVIDED BY V. NOEL/CWPB. CCTV WILL NOT BE |
| | NEEDED IF THE APPLICANT CAN PROVIDE DOCUMENTATION THAT |
| | THE OPERATION AND MAINTENANCE OF THE STORM SEWER IS NOT |
| | THE RESPONSIBILITY OF THE CITY. |
| | |
| | 9. [NEW COMMENT] EAST SIDE OF PROPOSED BUILDING WILL BE |
| | CONSTRUCTED CLOSED TO THE EXISTING DRAINAGE SYSTEM. |
| | THERE IS AN EXISTING CATCH BASIN INLET UNDER A PROPOSED |
| | BALCONY. |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |