| Date |
Text |
| 2019-11-12 14:56:00 | ***1ST REVIEW FROM TRAFFIC*** |
| | *** REVISED TRAFFIC STUDY COMMENTS 2019-11-13**** |
| | |
| | SITE PLAN COMMENTS: |
| | 5. PROVIDE BICYCLE LANES ON EXECUTIVE CENTER DRIVE. |
| | 6. PROVIDE MEDIAN PEDESTRIAN REFUGE ISLAND AND |
| | CROSSWALK ACROSS EXECUTIVE CENTER DRIVE JUST NORTH OF |
| | THE SOUTHERN DRIVEWAY. |
| | 7. PROVIDE PEDESTRIAN CONNECTION ALONG THE NORTHERN |
| | BOUNDARY OF PARCEL 1 TO CONNECT TO THE RETAIL, AND |
| | CONNECT THE EXISTING SIDEWALK WHICH RUNS ALONG THE |
| | SOUTHWEST PERIMETER OF THE EXISTING CONVENIENT STORE |
| | BUILDING TO THIS PEDESTRIAN CONNECTION. |
| | 8. DIMENSION THE SIDEWALK WIDTH. |
| | 9. INCLUDE THE REQUIRED BICYCLE PARKING ON THE SITE |
| | DATA TABLE AND SITE PLAN. |
| | 10. REDUCE THE WIDTH OF THE ONE-WAY DRIVEWAY FROM |
| | EXECUTIVE CENTER DRIVE TO 12 FEET AT THE ENTRANCE. |
| | 11. CONSIDER CONVERTING THE 18-FOOT ONE-WAY INTERNAL |
| | DRIVE AISLE NEAR THE DUMPSTER TO 20-FOOT TWO-WAY DRIVE |
| | AISLE FOR INTERNAL CIRCULATION. STRAIGHTEN THIS DRIVE |
| | AISLE AND PROVIDE STOP BAR, STOP SIGNS, RIGHT-TURN ONLY |
| | SIGNS, AND ONE-WAY SIGNS AS APPRECIATE TO CLARIFY |
| | VEHICULAR MOVEMENTS AROUND THIS AREA. |
| | 12. PROVIDE AUTOTURN PATHS FOR GARBAGE TRUCKS. |
| | 13. SHOW FULL RIGHT-OF-WAY WIDTH AND RIGHT-OF-WAY WIDTH |
| | FROM CENTERLINE. |
| | |
| | REVISED TRAFFIC COMMENTS: |
| | 14. PROVIDE COUNTY TPS LETTER. |
| | 15. THE EXISTING RESTAURANT APPEARS TO BE ABANDONED FOR |
| | MANY YEARS. PLEASE PROVIDE EVIDENCE (E.G. EVIDENCE OF |
| | ACTIVE FOOD SERVICE LICENSE) THAT THE RESTAURANT IS |
| | OPERATIONAL WITHIN THE PAST 5 YEARS, OR REMOVE IT FROM |
| | THE EXISTING TRIP CREDIT. |
| | 16. PROVIDE INTERSECTION ANALYSIS AT PALM BEACH LAKES |
| | BOULEVARD/EXECUTIVE CENTER DRIVE, AND INCLUDE 95TH |
| | PERCENTILE QUEUE LENGTHS FOR NORTHBOUND AND EASTBOUND |
| | MOVEMENTS. |
| | 17. PLEASE REVISE THE NUMBER OF LANES FOR EXECUTIVE |
| | CENTER DRIVE, WHICH IS A 2-LANE ROADWAY, IN TABLE 2. |
| | 18. PLEASE REVISE THE DESCRIPTION OF DRIVEWAYS IN THE |
| | TRAFFIC STATEMENT, E.G. ?EXISTING RIGHT-IN/RIGHT-OUT |
| | DRIVEWAY ON EXECUTIVE CENTER DRIVE? AND ?RIGHT-OUT ONLY |
| | DRIVEWAY ON PALM BEACH LAKES BOULEVARD?. |
| | 19. THE DRIVEWAY VOLUMES SHOWN IN FIGURE 2 DOES NOT |
| | APPEAR TO INCLUDE BEST BUY TRAFFIC VOLUMES. PLEASE |
| | REVISE. |
| | |
| | |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| | |
| |
Print |