| Date |
Text |
| 2019-11-12 15:19:29 | 1. PLEASE RESPOND IN WRITING TO ALL COMMENTS WITH Z |
| | PERMIT NUMBER, PROJECT NAME AND ADDRESS. |
| | 2. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS |
| | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, |
| | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND |
| | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, |
| | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE |
| | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING |
| | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, |
| | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL |
| | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER |
| | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE |
| | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN |
| | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. |
| | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT |
| | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL |
| | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, |
| | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & |
| | TELECOMMUNICATION FACILITIES LOCATED ON THE |
| | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL |
| | UTILITY CROSSINGS. |
| | 3. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY |
| | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY |
| | RIGHT OF WAY. |
| | 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE |
| | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB |
| | DEVELOPMENT APPLICATION). |
| | 5. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND |
| | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM |
| | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE |
| | PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. |
| | 6. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION |
| | (NAVD 88 AND NGVD 29). |
| | 7. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER ALONG |
| | ENTIRE PROJECT FRONTAGE. |
| | 8. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND |
| | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED |
| | AREAS. |
| | 9. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR |
| | PROPOSED SANITARY LATERALS. |
| | 10. PLEASE LABEL WATER LINES AS PRIVATE WHERE |
| | APPLICABLE. |
| | 11. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING |
| | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT |
| | HIM AT 561-494-2262 OR [email protected] |
| | 12. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS |
| | FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS |
| | 13. PLEASE CHECK TO SEE IF FDEP FORMS ARE NEEDED. |
| | 14. PLEASE CLEARLY LABEL CITY OF WPB POINTS OF SERVICE |
| | FOR UTILITY CONNECTIONS. |
| | 15. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER |
| | METER AND BACKFLOW PREVENTION. INCLUDE EASEMENT |
| | DEDICATION FOR WATER METER. |
| | 16. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT |
| | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW |
| | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL |
| | BACKFLOWS. |
| | 17. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES |
| | OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. |
| | 18. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| | LEAD-FREE DESIGN. |
| | |
| | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD |
| | CUSTOMER SERVICE SUPERVISOR, PUBLIC UTILITIES: |
| | 1. PLAN DOES NOT SHOW UTILITY EASEMENTS AROUND THE FIRE |
| | HYDRANTS AND METERS FOR BOTH EXISTING AND NEW. SMALL UE |
| | SHOULD BE CREATED AROUND THEM AND SERVICE PIPE TO THEM |
| | THAT SITS ON THE PRIVATE PROPERTY. THE UE SHOULD |
| | EXCLUDE THE BACKFLOW ASSEMBLIES. |
| | 2. PLAN ALSO MISSING THE PIPING FROM WATER MAIN TO THE |
| | EXISTING WATER SERVICES. |
| | 3. PLAN SHOWS 2 FIRE HYDRANTS ON SITE. THE SOUTHERN |
| | FIRE HYDRANT IS PROBLEMATIC BECAUSE THE PIPE FEEDING IT |
| | RUNS UNDER THE ENTRANCE, SO IF ANY MAINTENANCE NEED BE |
| | DONE THERE IT WOULD STOP THE FLOW OF TRAFFIC. IS THAT |
| | FIRE HYDRANT REQUIRED TO BE THERE, OR COULD IT BE |
| | ELIMINATED? (ALSO VALVE TURNING OFF HYDRANT IS IN |
| | MIDDLE OF ENTRANCE ROAD -> SAFETY HAZARD) |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | RICK ROSSANO, PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | DIRECT: (561) 494-1098 |
| | [email protected] |
| | |
| |