Plan Review Notes
Plan Review Notes For Project Z19090032
Project Number Z19090032
Review Stop ENG - PPRC
Sequence Number 3
Notes
Date Text
2021-09-24 08:25:02COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 4. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW
 PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER,
 STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND
 OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL
 AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW.
 DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY,
 PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 5. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 6. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT
 DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW
 PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL
 BACKFLOWS.
 7. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE; AND
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO
 NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE
 CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE
 ENGINEERING PERMIT.
 8. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT
 OF WAY AND SHOW ANY CROSSINGS/CONFLICTS.
 9. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 10. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN
 IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50
 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL
 GC-8.
 11. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 -THERE ARE A COUPLE BIKE RACKS PROPOSED OVER PLUMBING
 OR DRAIN PIPE. MAY MAKE MAINTENANCE OF PIPE MORE
 DIFFICULT.
 -WILL THE GYMNASIUM BUILDING GET POTABLE WATER FROM
 PLUMBING CONNECTION TO EXISTING BUILDING, OR A NEW
 METERED WATER SERVICE?
 -FOR FORMAL ENGINEERING SUBMITTAL UPDATE WATER PLANS AS
 FOLLOWS: CALLOUT DISTANCE BETWEEN UTILITY POLE AND
 SEWER LATERAL NEAR SOUTHWEST CORNER OF PROPERTY,
 CALLOUT DISTANCE BETWEEN 4 BY 4 FIRE TEE AND LIGHT
 POLE, SHOW FIRE FLOW CALCULATIONS, LABEL PIPING BETWEEN
 WATER MAIN AND DCDA AS DIP, ADD GATE VALVE UPSTREAM OF
 DCDA BETWEEN SIDEWALK AND PROPERTY LINE AND LABEL AS
 POINT OF SERVICE.
  
 -SEWER LATERALS IN OUR SERVICE AREA ARE TYPICALLY 6
 INCH MINIMUM. PLEASE REVIEW AND UPDATE AS NEEDED AT
 FORMAL ENGINEERING SUBMITTAL.
  
 COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB
 PUBLIC UTILITIES, 561-494-1047, [email protected] :
  
 -PLEASE SHOW PROFILE AT TAP AND POINT OF SERVICE.
 -ADD NOTE THIS IS WITH LS #21 SERVICE BOUNDARY.
 -ADD EXISTING DRY UTILITIES.
 -CALL OUR DIMENSIONS FOR EASEMENT.
 -SHOW DETAIL FOR DCDA (CITY?S)
 -SHOW EXISTING VALVES (IF ANY).
 -SHOW EXISTING SEWER LATERALS AND WATER SERVICES
 CURRENTLY SERVING PROPERTY. IF NOT IN USE, CUT AND CAP
 AT THE MAIN.
 -CALL OUT TYPICAL UTILITY CROSSING WITH VERTICAL
 CLEARANCE.
 -MAKE NOTE ON MH ON 21ST ST. ?ADJUST TO FINISHED GRADE
 AS REQUIRED?
 -PROVIDE CCTV OF NEW SEWER LATERALS.
 -WHAT IS THE DASHED LINE (CIRCLE ON 19TH ST)?
 -SHOW EXISTING WATER/SEWER SERVICES ON 19TH ST. AND
 PROPOSED IMPROVEMENTS.
 -FOR THE 18? VCP SWM ADD NOTE TO REHAB AS REQUIRED.
  